My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2010_14
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2010_14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 12:56:45 AM
Creation date
7/3/2020 10:55:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2010_14
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2010_14.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
415
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BASE AND SLOPE LEACHATE COLLECTION AND REMOVAL SYSTEM DESIGN <br /> WMU FU-10 <br /> FORWARD LANDFILL <br /> PROBLEM: <br /> Size the leachate collection and removal system components for the base and slope in WMU FU-10. <br /> GIVEN: <br /> These calculations were previously performed for the WMUs D-95,D-97,D-98,D-99,D-00,D-0 1,D-02, <br /> FU-03,FU-04,FU-05,FU-06 and FU-08 design. The same methodology for performing the previous <br /> calculations was used for the WMU FU-10 calculations. Previous calculations are used,referenced,or <br /> attached,where applicable. <br /> SUMMARY: <br /> 1. Required permeability of granular drainage material is 0.1 cm/sec. <br /> 2. Required permeability of coarse gravel is 1 cm/sec. <br /> 3. Specify 6-inch diameter,SDR 11 HDPE pipe. <br /> 4. Specify perforation pattern for pipes of'/2-inch diameter holes drilled at third points every 6-inches <br /> along pipe length. <br /> 5. The temporary sumps are sized assuming 10-ft of refuse in WMU FU-10. <br /> 6. Site personnel will select the pump size. <br /> 7. A 200-mil GDN with a hydraulic transmissivity of 1 x 10"5 m2/sec measured using water at 68°F f3°F <br /> (20°C f1.5°C) with a hydraulic gradient of 0.5 under a compressive stress of 10,000 psf. The <br /> geocomposite shall be tested with onsite soil above the Geocomposite and Geomembrane below the <br /> Geocomposite. The minimum test duration shall be 100 hours and the report for the test results shall <br /> include measurements at intervals over the entire test duration. <br />
The URL can be used to link to this page
Your browser does not support the video tag.