1,0 INTRODUCTION
<br /> On behalf of Forward Inc. (Forward),this report presents water quality monitoring data
<br /> generated during the fourth quarter 2010 monitoring period and also presents an annual
<br /> summary of the monitoring results for the 2010 monitoring year for the Forward Landfill
<br /> in San Joaquin County, California. Monitoring was performed in accordance with
<br /> requirements listed in the Central Valley Regional Water Quality Control Board
<br /> (RWQCB) Order No. R5-2003-0049. For reporting purposes the water quality
<br /> monitoring network consists of two units: the Forward Unit and the Austin Unit. Section
<br /> I provides a description of the monitoring network, site inspections, and standard
<br /> observations; Sections 2 and 3 include discussions of water quality data for the Forward
<br /> and Austin Units,respectively; and Section 4 presents an annual summary for the
<br /> Forward and Austin Units.
<br /> 1.1 MONITORING NET
<br /> The water quality monitoring network at the Forward Unit currently includes 15
<br /> groundwater monitoring wells (five of which are dual depth well pairs), one domestic
<br /> well, two surface water monitoring stations, and 17 lysimeters (Figure 1-1). Monitoring
<br /> wells at the Forward Unit have been constructed to monitor groundwater at the facility as
<br /> follows:
<br /> Forward Unit Groundwater Monitoring_Network
<br /> Monitoring Point Monitoring Point I.D.
<br /> Groundwater Monitoring MW-22,MW-23R,MW-24
<br /> Wells-Background
<br /> Groundwater Monitoring MW-lA/B,MW-2A/B,MW-3AB,MW-10,
<br /> Wells-Compliance MW-13A/13,MW-14A/13,MW-15,MW-16,MW-17,MW-18,
<br /> MW-19,MW-21
<br /> Domestic Well DW-9690
<br /> Piezometers MW-1B,MW-2B,MW-313,MW-13B,MW-14B
<br /> Surface Water Stations FSW-1,FSW-2
<br /> Lysimeters E-1,E-2,W-1,W-2,LY-A,LY-BG 1,LY-ElA,LY-EIB,LY-E2 A,
<br /> LY-E213,D-93A,D-93B,WMW-D-01,WMW-D-02,LY-POND-N,
<br /> LY-POND-S,FU-03
<br /> The monitoring network at the Austin Unit currently includes 18 groundwater monitoring
<br /> wells, two domestic wells, and two surface water monitoring stations (Figure 1-1). Of
<br /> note,wells AMW-5R and AMW-I 9BR were constructed to replace wells AMW-5 and
<br /> -19B,which were abandoned, and wells AMW-1 3B, -2 1, AMW-22, and
<br /> AMW-23 were constructed as part of an on-going evaluation monitoring program(EMP).
<br /> The detection monitoring program (DMP) wells are used to detect for a potential release
<br /> from the landfill, while the corrective action program(CAP)wells are used to evaluate
<br /> changes in water quality caused by releases from the landfill and by subsequent
<br /> corrective action measures. Monitoring points at the Austin Unit have been constructed
<br /> to monitor the groundwater/surface water at the facility as follows:
<br /> D*12010_0013\FA_4Q10.doc
<br /> Geologic Associates
<br />
|