Laserfiche WebLink
---------- <br /> -------------------------- ......... <br /> ....... ------- ..... . <br /> 5. The plan on page 4,third paragraph states that the bentonite slurry shall be installed <br /> above the bentonite chip to approximately 2 feet below the ground surface. The <br /> remaining 2 feet will be filled with soil...The diagram on page 11 of 13 shows <br /> cement slurry for the top 2 feet. All sealing materials placed above the bentonite <br /> plug are required to be neat cement. <br /> 6. The plan on page 5,in the background paragraph,it stated that the SWFP is <br /> currently being revised to include the southwestern expansion as a buffer area. <br /> Currently the EHD has not received an application for permit revision. <br /> If you have any questions regarding this matter you can contact me at(209)468-0332 <br /> Sincerely, <br /> Robert McClellon,Program Coordinator <br /> Environmental Health Department <br /> Cc: Kevin Basso, General Manager,Forward Inc. <br /> Don Litchfield,Environmental Manager,Forward Inc. <br /> Page 2 of 2 October 13,2010 <br />