Laserfiche WebLink
'q- Pre'-processed ADC materials 1W, - will be 18inches or less in dimension. <br /> r. The pre-processed treated auto shredder waste must be deployed in a manner that does not allow the mixing of the cover and the <br /> waste. The pre-processed treated auto shredder waste cannot be used during rainy weather or anticipated rainy.weather. <br /> s. The ash and cement kiln dust must be applied in such a manner as not to create voids or dust. <br /> t. For shredded green material ADC,the following conditions must be met: <br /> A track dozer is to be used to spread and compact the green material. <br /> ® The processed green material shall not contain greater than five(5)percent contamination(plastic or paper bags,mix solid <br /> waste,or construction and demolition waste). <br /> • The processed green material must have a minimum thickness of 6 inches and an average compacted thickness of 12 inches <br /> u. The use of the ADC shall conform to all conditions of the ADC demonstration project as approved by the LEA and maybe <br /> suspended or modified at any time for sufficient cause. <br /> v. If the site operator plans to use a new ADC,lallowedtho��de�s i azneIIdment 150 days prior to the anticipated Title 27,CCF,Section hange,the operator must submit <br /> any proposed changes to the ADC program <br /> al measures to adequately control nuisances resulting from landfilling activies as <br /> w. The LEA reserves the right to require addition <br /> needed <br /> x. The operator shall at all times provide adequate staffing to deal effectively and promptly with operations at the site as needed <br /> .Y <br /> y. The operator shall provide at all times adequate numbers and types of operable equipment for compaction and placement of the <br /> waste and cover at the facility. <br /> Z. An adequate water supply for dust and fire suppression shall be available at all times during the operation of this facility.The <br /> water supply must be acceptable to the local fire jurisdiction and the LEA. <br /> l be fin-nished upon <br /> aa. Additional information cEA.The operator must supply the LEA with any infe design and operation of the facity ormation request <br /> oncerningrmation the LEA d ems nec ssary to onduc an <br /> frame specified by the L <br /> inspection or to review and rewrite a Solid Waste Facility Permit. <br /> bb. The LEA must receive notification from the facility operator 48 hours prior to operating on a Sunday. <br /> Page 5 of <br />