Laserfiche WebLink
, <br /> Part 3.FACILITY INFORMATION <br /> A.PROPOSED CHANGE(Check applicable box(es)): <br /> F1 1.DESIGN(describe): <br /> F-12.OPERATION(describe): <br /> ®3. OWNER,OPERATOR,ADDRESS,AND/OR FACILITY NAME CHANGE(describe): <br /> 04.OTHER(describe): Revision of Facility Boundary to arcorpomte buffer area only. <br /> B.FACILITY INFORMATION: <br /> 1.INFORMATION APPLICABLE TO ALL FACILITIES: <br /> a. PEAK DAILY TONNAGE OR CUBIC YARDS <br /> 46,080 Tons per Week.Not to exceed 8,668 tats per day(TPD)-Beneficial reuse material quantities listed below are a <br /> subset of this peak disposal inflow rate. In no case will any combination of MSW and the beneficial reuse materials exceed <br /> 1) DISPOSALITRANSER(unit) 8,668 TPD. <br /> Processed Green Material-1,100 tons,Contaminated Soil-3,200 tons;Beneficial Reuse Inerts-3,000 tons,Ash and <br /> Cement Kiln Dust-172 tons,Treated Auto Shredder Waste-915 tons,and Shredded Tires-215 tons(refer to JTD Section <br /> 2) OTHER(unit) 4.3.1) <br /> b. DAILY DESIGN TONNAGE(TPD) 8,668 tons <br /> c. FACILITY SIZE(acres) 744 acres(based on Assesor's Parcel Information) <br /> d. PEAK TRAFFIC VOLUME PER DAY(vpd) 620 <br /> Receipt of Waste:Monday through Saturday 4:00 am to 9:00 pm;Facility Operating Hours:Monday through Saturday <br /> e. DAYS AND HOURS OF OPERATION 4:00am to 9:30 pm;Sunday Receipt of Waste and Operating Hours:Twee(20)Sundays per year 7:00 am to 4:00 pm. <br /> 2.ADDITIONAL INFO.REQUIRED FOR COMPOSTING FACILITIES ONLY: <br /> a. SITE STORAGE CAPACITY(cu yds) Not applicable <br /> 3.ADDITIONAL INFORMATION REQUIRED FOR LANDFILLS ONLY: <br /> a. AVERAGE DAILY TONNAGE(TPD) 5,520 <br /> b. SITE CAPACITY CURRENTLY PERMITTED(Airspace)(cu yds) 51.0 MU <br /> c. SITE CAPACITY PROPOSED(Airspace)(cu yds) Not Applicable <br /> d. SITE CAPACITY USED TO DATE(Airspace)(cu yds) 27.9 mcy <br /> e. SITE CAPACITY REMAINING(Airspace)(cu yds) 23.1 <br /> L DATE OF CAPACITY INFORMATION(Date)(See Instructions): 6/8/2011 <br /> % LAST PHYSICAL SITE SURVEY(Date) 3/17/2011 <br /> h. ESTIMATED CLOSURE DATE(month and year) Apr-21 <br /> I. DISPOSAL FOOTPRINT(acres) 354.5 acres <br /> J. SITE CAPACITY PLANNED(cu yds) Not Applicable <br /> k. 1. (1) IN-PLACE WASTE DENSITY(Ibs of waste per cu yd of waste) 1788 Ibs/cy <br /> AND <br /> (ii)WASTE-TO-COVER RATIO(Estimated)(v-.v) 4:1 <br /> OR <br /> 2. AIRSPACE UTILIZATION FACTOR(tons of waste per cu yd of landfill airspace) <br /> Part 4.SOURCE OF WATER SUPPLY(Check applicable boxes) <br /> ®A. MUNICIPAL OR UTILITY SERVICE: <br /> Xo6.INDIVIDUAL(wells): <br /> ®C.SURFACE SUPPLY: <br /> 1.NAME OF STREAM,LAKE,ETC.: <br /> 2.TYPE OF WATER RIGHTS: <br /> ®RIPARIAN ®APPROPRIATION <br /> Page 2 <br />