Laserfiche WebLink
GENERAL CONSIDERATK ;: <br /> 1. Does it appear that any environmental feature of the project will generate significant public <br /> concern or controversy? <br /> ❑Yes® No Nature of concern(s): <br /> 2. Will the project require approval or permits by agencies other than the County? <br /> ®Yes ❑ No Agency name(s): Department of Recycle and Recovery;SJVAPCD. <br /> i <br /> 3. Is the project within the Sphere of Influence, or within two miles, of any city? <br /> ®Yes ❑ No City: Stockton <br /> ENVIRONMENTAL IMPACTS: <br /> i <br /> "Yes" may only be checked in situations where there is substantial evidence to indicate that there may <br /> be a significant adverse impact on the environment if there is no change in the project description. <br /> C( EQA Guidelines, Sec. 15064) <br /> See the"Discussion"section at the end of the Initial Study for explanation of any impacts checked "Yes", <br /> or any"No"answer marked with an asterisk(*). <br /> Sources:The following sources of information have been used in determining environmental impacts: <br /> Original source materials and maps on file in the Community Development Department including: all <br /> County and City general plans and community plans; assessor parcel books; various local and FEMA <br /> flood zone maps; service district maps; maps of geologic instability; maps and reports on endangered <br /> species such as the Natural Diversity Data Base; noise contour maps; speck roadway plans; maps <br /> and/or records of archeological/historic resources; soil reports and maps; etc. Many of these original <br /> source materials have been collected from other public agencies or from previously prepared EIR's and <br /> other technical studies. <br /> Additional standard sources which should be specifically cited below include on-site visits by staff(note <br /> date); staff knowledge or experience; and independent environmental studies submitted to the County as <br /> part of the project application (note report title, date, and consultant). <br /> 1. Water: <br /> a. Is any portion of the project subject to flood hazard? <br /> Flood zone: Portion of prosect site in Flood Zone A. ®Yes ❑ No* <br /> b. Will the project result in reduction of surface or ground water <br /> quality or quantity? ❑Yes ® No <br /> c. Will the project result in increases to surface, channel or <br /> stream volumes, or alterations to drainage patterns and streams? ❑Yes ® No <br /> d. Will the project result in erosion of or sedimentation to a channel, <br /> river, or body of water? ❑Yes ® No <br /> Other sources used: <br /> Initial Study -2- Revised 5-00 <br />