6-1 <br /> 6.0 CLOSURE/POST-CLOSURE MAINTENANCE COST ESTIMATES <br /> 6.1 Introduction <br /> In order to establish the basis for the proper level of funding to close and provide post- <br /> closure maintenance for Stage 1B of Forward in an environmentally sound manner, a cost <br /> estimate was prepared reflecting the proposed closure design and post-closure <br /> maintenance procedures was included in the 2005 Stage 1A PFCPCMP. <br /> The FL owner/operator, Republic, utilizes a Letter of Credit to guarantee closure of Forward. <br /> The Stage 1B Partial Final Closure Area will be funded by Republic. No closure/post-closure <br /> maintenance cost estimate was prepared for inclusion in this PFCPCMP. Once the Stage 1B <br /> closure area is fully closed and certified, the PCPCMP will be updated to reflect the <br /> additional closure area and adjustment of the closure cost estimate, which is based on the <br /> maximum extent of areas needing closure, if required. <br /> 6.2 Disbursement of Funds <br /> In accordance with 27 CCR, Section 21800, the operator is required to provide a detailed <br /> schedule for disbursement of funds for closure for advance payment of closure construction <br /> activities to be performed in accordance with the Plan or reimbursement of costs to be <br /> performed in accordance with the Plan. However, as discussed above, the FL <br /> owner/operator, Republic, utilizes a Letter of Credit to guarantee closure of the FL. <br /> Therefore, the Stage 1B closure area will be funded by Republic. No closure/post-closure <br /> maintenance cost estimate was prepared for inclusion in this PFCPCMP. Once the Stage 1B <br /> ® closure area is fully closed and certified, the PCPCMP will be updated to reflect the <br /> additional closure area and adjustment of the closure cost estimate, which is based on the <br /> maximum extent of areas needing closure, if required. <br /> 6.3 Post-Closure Maintenance Cost Estimate <br /> The post-closure maintenance cost estimate was prepared utilizing the current closure <br /> design information, as well as estimates of manpower, materials, and equipment to <br /> maintain Forward in compliance with current applicable regulations. The maintenance and <br /> monitoring costs were developed utilizing current regulations and applicable requirements. <br /> In the event that changes occur in the regulatory conditions pertaining to Forward, these <br /> estimates will be adjusted accordingly, as required, and submitted to CalRecycle, the LEA, <br /> and the RWQCB. <br /> The total annual maintenance and monitoring cost estimate for post-closure is included in <br /> the FL Preliminary Closure and Post-Closure Maintenance Plan (PCPMP) (dated 2008) <br /> (Appendix H). These costs were estimated in 2008 dollars. The total 30-year post-closure <br /> maintenance cost estimate was calculated by multiplying the annual cost estimate by 30. <br /> As discussed earlier, all post-closure maintenance activities for the partial final closure <br /> phase will be handled as part of on-going operation of the FL. However, once the entire FL is <br /> closed, the 30-year minimum post-closure maintenance period will begin. <br /> Forward Landfill Stage 113 Partial Final Closure/Post-Closure Maintenance Plan-June 2011 <br /> SWT Engineering <br /> z:\projects\allied waste\forward\11-1014 partial fnl clsr pin\partial final closure plan document\text\sec 6.doc <br />