My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2011_27
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2011_27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 8:38:02 PM
Creation date
7/3/2020 10:56:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2011_27
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2011_27.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
494
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6-1 <br /> 6.0 CLOSURE/POST-CLOSURE MAINTENANCE COST ESTIMATES <br /> 6.1 Introduction <br /> In order to establish the basis for the proper level of funding to close and provide post- <br /> closure maintenance for Stage 1B of Forward in an environmentally sound manner, a cost <br /> estimate was prepared reflecting the proposed closure design and post-closure <br /> maintenance procedures was included in the 2005 Stage 1A PFCPCMP. <br /> The FL owner/operator, Republic, utilizes a Letter of Credit to guarantee closure of Forward. <br /> The Stage 1B Partial Final Closure Area will be funded by Republic. No closure/post-closure <br /> maintenance cost estimate was prepared for inclusion in this PFCPCMP. Once the Stage 1B <br /> closure area is fully closed and certified, the PCPCMP will be updated to reflect the <br /> additional closure area and adjustment of the closure cost estimate, which is based on the <br /> maximum extent of areas needing closure, if required. <br /> 6.2 Disbursement of Funds <br /> In accordance with 27 CCR, Section 21800, the operator is required to provide a detailed <br /> schedule for disbursement of funds for closure for advance payment of closure construction <br /> activities to be performed in accordance with the Plan or reimbursement of costs to be <br /> performed in accordance with the Plan. However, as discussed above, the FL <br /> owner/operator, Republic, utilizes a Letter of Credit to guarantee closure of the FL. <br /> Therefore, the Stage 1B closure area will be funded by Republic. No closure/post-closure <br /> maintenance cost estimate was prepared for inclusion in this PFCPCMP. Once the Stage 1B <br /> ® closure area is fully closed and certified, the PCPCMP will be updated to reflect the <br /> additional closure area and adjustment of the closure cost estimate, which is based on the <br /> maximum extent of areas needing closure, if required. <br /> 6.3 Post-Closure Maintenance Cost Estimate <br /> The post-closure maintenance cost estimate was prepared utilizing the current closure <br /> design information, as well as estimates of manpower, materials, and equipment to <br /> maintain Forward in compliance with current applicable regulations. The maintenance and <br /> monitoring costs were developed utilizing current regulations and applicable requirements. <br /> In the event that changes occur in the regulatory conditions pertaining to Forward, these <br /> estimates will be adjusted accordingly, as required, and submitted to CalRecycle, the LEA, <br /> and the RWQCB. <br /> The total annual maintenance and monitoring cost estimate for post-closure is included in <br /> the FL Preliminary Closure and Post-Closure Maintenance Plan (PCPMP) (dated 2008) <br /> (Appendix H). These costs were estimated in 2008 dollars. The total 30-year post-closure <br /> maintenance cost estimate was calculated by multiplying the annual cost estimate by 30. <br /> As discussed earlier, all post-closure maintenance activities for the partial final closure <br /> phase will be handled as part of on-going operation of the FL. However, once the entire FL is <br /> closed, the 30-year minimum post-closure maintenance period will begin. <br /> Forward Landfill Stage 113 Partial Final Closure/Post-Closure Maintenance Plan-June 2011 <br /> SWT Engineering <br /> z:\projects\allied waste\forward\11-1014 partial fnl clsr pin\partial final closure plan document\text\sec 6.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.