Laserfiche WebLink
First Quarter 2011 Job No.07207048.00 <br /> Table 1. LFG MonitoringProbe andSubsurface Testing Results <br /> Forward Landfill, Manteca, California <br /> Carbon Rel <br /> Methane Dioxide 02 Balance Press <br /> Name Date Time (%by vol) (%by vol) (%by vol) (%by vol) (H2O inch) Comments <br /> GP-11D 2/7/20118:10 0 11.6 5.8 82.6 0.03 <br /> GP-11D 2/14/201115:45 0 0.4 1 20.4 79.19 -0.02 <br /> GP-11D 2/21/201113:36 0 1.2 19.6 79.2 0 <br /> GP-11D 2/28/20119:29 0 0.6 20.4 79 -0.12 <br /> GP-11D 3/10/201114:49 0 0.7 20.4 78.9 -0.24 <br /> GP-111 3/14/201116:41 0 0.8 20.2 79 -0.1 <br /> GP-11D 3/21/201112:26 0 0.7 20.7 78.6 -0.22 <br /> GP-11D 3/30/201112:42 0 0.3 20.4 79.29 -0.06 <br /> GP-11M 1/5/201111:23 1 22.6 0.2 76.2 0.01 <br /> GP-11M 1/19/20118:30 0 14.9 2.4 82.7 -0.09 <br /> GP-11M 1/31/201111:33 1 15.2 0.5 83.3 0 <br /> GP-11M 2/7/20118:11 5.6 17.6 0 76.8 0.05 <br /> GP-11M 2/14/201115:46 0 9.1 13.1 77.8 -0.11 <br /> GP-11M 2/21/201113:37 0 10.9 10.4 78.69 -0.17 <br /> GP-11M 2/28/20119:30 0 14.3 9 76.69 -0.29 <br /> GP-11M 3/10/201114:50 0 14.3 10.3 75.39 -0.29 <br /> GP-11M 3/14/201116:42 0 13.9 10.8 75.29 -0.24 <br /> GP-11M 3/21/201112:28 0 13.6 10.6 75.8 -0.61 <br /> GP-11M 3/30/201112:44 0 13.3 9.9 76.79 -0.16 <br /> GP-11S 1/5/201111:24 0 23.3 8 68.69 0.01 <br /> GP-11S 1/19/20118:32 0 7.6 15.4 77 -0.13 <br /> GP-115 1/31/201111:34 0 13.1 6.4 80.5 0 <br /> GP-11S 2/7/20118:12 0.4 16.8 1.7 81.1 0.04 <br /> GP-11S 2/14/201115:47 0 5.8 15.1 79.1 -0.06 <br /> GP-11S 2/21/201113:38 0 14.1 14.4 71.5 -0.13 <br /> GP-11S 2/28/20119:32 0 14.7 15.1 70.2 -0.3 <br /> GP-11S 3/10/201114:52 0 13.8 15.5 70.69 -0.26 <br /> GP-11S 3/14/201116:43 0 13.1 15.8 71.1 -0.18 <br /> GP-11S 3/21/201112:29 0 12.2 16.6 71.2 -0.49 <br /> GP-11S 3/30/201112:45 0 10.9 16.4 72.69 -0.15 <br /> GP-12D 1/5/201111:27 0 7.7 10.3 82 0.01 <br /> GP-12D 1/19/20118:35 0 7.5 9.8 82.7 -0.02 <br /> GP-12D 1/31/201111:37 0 7.4 9.6 83 1 0.04 <br /> r <br />