Laserfiche WebLink
FORWARD LANDFILL <br />2012-2013 WINTERIZATION PLAN <br />1. Recent History <br />Forward constructed WMU FU -10 in 2010. Forward has been disposing <br />Class II and Class III refuse in WMU FU -10 and in the completed cells to <br />the west of WMU FU -10. There was no new cell constructed in 2011 or <br />2012. <br />2. Reseeding and Erosion Control <br />An annual inspection of the vegetative cover has been completed. The <br />areas that were found to lack necessary cover have been hydro -seeded to <br />control erosion. Presently all erosion has been addressed and will be <br />policed throughout the wet season. <br />3. Drainage <br />Non -contact water will be directed to three locations. The first location <br />(number one (1)) accumulates non -contact water from the current <br />Resource Recovery area and is located on the west corner of the <br />Resource Recovery Center, south of the South Fork of Little Johns Creek. <br />The second location (number two (2)) services the current southern <br />portion of the Forward Landfill and is located at the southwest corner of <br />this area, north of the South Fork of Little Johns Creek. The third non - <br />contact water location (number three (3)) is located at the southwest <br />corner of the northern portion of Forward Landfill, directly west of WMU <br />FU -03. <br />All non -contact water in locations #1 and #2 are held in a sediment pond <br />and then sampled and analyzed in accordance with Forward Landfill's <br />