Laserfiche WebLink
Mr. Don Litchfield <br />March 30, 2012 <br />Page 3 <br /> <br /> <br />Test results (Table 1) indicated that all GP probes tested exhibited methane gas concentrations <br />below the LEL (5 percent by volume) or no methane gas was detected. These results indicated <br />that as of the date of this report, the subject site perimeter probes are in compliance with the <br />requirements of Title 27 CCR Article 6. <br /> <br />On February 23, 2012, SCS performed initial testing of the recently approved monitoring <br />network probes defined as (GP) Nos. 7R (A, B, C) through 12R (A, B, C) and 28R (A, B, C). <br />These locations have replaced the old perimeter monitoring network as authorized by the San <br />Joaquin County Local Enforcement Agency and Cal Recycle. Results of this monitoring <br />indicated that no methane gas concentrations in excess of 5 percent by volume were detected at <br />any location tested (Table 1). <br /> <br />Also, during this reporting period, SCS performed monitoring of temporary subsurface evaluation <br />probe Nos. TGP-01 through TGP-39 (Table 1). Results of this testing indicated that most of these <br />evaluation probes exhibited methane gas concentrations above the LEL (up to 58.5% by volume). <br />Note, that the methane gas concentrations at these locations, which are for evaluation purposes and <br />are not compliance locations, have indicated a fluctuating trend. <br /> <br />SCS is scheduled to perform second quarterly monitoring of 2012 (April through June) of the GP <br />probes by the end of the month of June 2012, or as directed by RSI. <br /> <br />ON-SITE INTERIOR STRUCTURE TESTING <br /> <br />In accordance with the approved testing schedule, the interiors of on-site structures are to be tested <br />at a minimum, on a quarterly basis. On March 28, 2012, on-site structures (i.e., landfill office, <br />portable office, scale house, locker room and supply room) were tested for the presence of methane <br />gas. In each structure, random selected locations (i.e., electrical outlets and junction boxes, <br />conduits, drains, floor cracks, etc.) were tested. Test results (Table 1A) indicated no methane gas <br />was detected at any accessible location tested. <br /> <br />SCS is scheduled to perform second quarterly monitoring of 2012 (April through June) of the <br />interiors of on-site structures by the end of the month of June 2012. <br /> <br />STANDARD PROVISIONS <br /> <br />This report addresses conditions at the subject site during the test dates only. Accordingly, we <br />assume no responsibility for any changes that may occur subsequent to our monitoring which <br />could affect the quantity of LFG at the subject site or adjacent properties. <br />