Laserfiche WebLink
Leachate samples were collected on a monthly basis and analyzed in the field for pH, <br />specific conductance, and temperature. Results of monthly field monitoring <br />measurements for the third quarter 2012 are presented in Table 2-6. <br />Value Engineering conducted a gat test of the leachate collection and removal system <br />(LCRS) on September 7, 2012 at the Forward Unit. The test results indicate that an open- <br />air conduit is present across the LCRS units, and no excessive leachate is backed up in <br />the drainage layer or sump of the LCRS units. A summary of the test results is provided <br />in Appendix A. <br />gM m T.&I 4TIM a �1 <br />Site run-on and run-off control facilities are designed to effectively channel surface water <br />to site stormwater/sedimentation ponds. According to the Operations Manager, there <br />were no discharges to surface water during the reporting quarter. On August 14, 2012, <br />Del -Tech reported that both surface -water monitoring stations FSW- I and FSW-2 were <br />dry. <br />For the Forward Unit, no significant changes in the water quality analytical results were <br />noted. During the third quarter 2012 monitoring period, PCE was measured at an <br />estimated trace concentration in the sample collected from well MW -14. No other VOCs <br />were detected in the Forward Unit groundwater monitoring wells. CLs were exceeded <br />for one or more inorganic constituents in wells MW -2A, MW -3, MW -13, MW -14, MW - <br />15, MW -18, and MW -19. Excluding non -impact constituents, confirmation sampling for <br />calcium, chloride, and potassium in well MW -13; chloride in well MW -13; and for <br />calcium, magnesium, and sodium in well MW -18 will be performed in November 2012 <br />during the fourth quarter 2012 monitoring event, and in December 2012. The results of <br />the confirmation sampling will be provided under separate cover. <br />I 119110911 <br />ELI= <br />During the third quarter 2012, depth -to -water measurements were recorded and the <br />Austin Unit's DMP and CAP groundwater monitoring wells were sampled by Del -Tech <br />on August 15, and September 11, 2012. All domestic wells and surface water stations <br />were sampled on August 27, 2012. <br />Samples were collected from each sample point with sufficient liquid and submitted to <br />BC for analysis of the parameters stipulated in RWQCB Order No. R5-2003-0049. Table <br />2-1 presents the monitoring schedule and summarizes the analytical methods utilized <br />during the current monitoring period. Water quality samples were also analyzed in the <br />CA2012-0025TA 3QI2.doe 7 Geo -Logic Associates <br />