Laserfiche WebLink
Project'Name FogWAft L&LDt-LLk- dVAIXE <br />1wpcctoesNi�n—e9V-0UJt- K1$kPYht!-L' CIMINERO% <br />Unit Tested UJ 0 <br />Date <br />ANNUAL L. GAS TEST INSPEC71TON <br />(A) PRE-TEST INSPECTION <br />1. Are all potential conduits sealed properly? 3,esX_ no <br />2. Do any potential conduits require repair? yes— np—AN <br />3. If any ofthe potential conduits required repair please list:_ 0 IJA --A <br />4. Arc any repairs needed to continue gas testing? yes no ---Z- <br />5. Total number of potential conduits that require repair: Vw� <br />6. If repairs are required, complete a Maintenance Work Order (MWO). <br />(B) GAS INJECTION PHASE <br />TTaccr Gas u I sed: Sa&4&v ffkea"&n� unit: LtIA4 u — <br />Start time of tracer gas ifijection: OAM Meter Start Reading-2— <br />Stop time of tracer gas injection:— /o:o5AM meter stop Reading: 611.1 <br />Total volume of tracer gas i*cted (cubre feet) : 157- 1 !&r,--4= <br />Average flow rate of injected tracer gas(cubic feet per min.): <br />Signature ofhispector_4/11� <br />E <br />