My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Operations layer soil overlying the liner system components shall immediately follow the <br />installation of the geomembrane and other geosynthetics overlying the GCL. If areas <br />cannot be covered immediately due to steepness of slopes, visqueen or equivalent shall <br />be placed over any exposed GCL. The GCL shall be removed and replaced if it becomes <br />hydrated before the operations layer soil is placed. <br />• All hydrated GCL will be removed and replaced by the Geosynthetics Contractor at no <br />additional cost to the Owner. <br />• On slopes steeper than 10 horizontal to 1 vertical, all GCLs shall be continuous down the <br />slope; that is, no horizontal seam shall be allowed in the slope. <br />• All GCLs will be overlapped. Along the length of the mat, the overlap will be 12 in. <br />(150 mm). Along the width of the mat, the overlap will be 12 in. (300 mm). Additional <br />manufacturers recommendations regarding overlaps will be adhered to. <br />• The overlaps will not be nailed or stapled to the subgrade. <br />The QA/QC Consultant will note any non-compliance and report it to the Construction Manager. <br />4.5.4 Repair <br />Any holes or tears in the GCL will be repaired by placing a GCL patch over the hole; the patch will <br />overlap the edges of the hole or tear by 2 ft (0.6 m) in all directions. If deemed necessary by the <br />Design Engineer, the patch will be secured with a water-based adhesive approved by the <br />Geosynthetics Contractor. Care will be taken to remove any soil or other material that may have <br />penetrated the torn GCL. All repairs will be made at no additional cost to the Owner. The patch will <br />not be nailed or stapled. <br />The QA/QC Consultant will observe any repair, note any non-compliance with the above <br />requirements and report them to the Construction Manager. <br />4.5.5 Materials in Contact with GCL <br />Equipment used for placing granular material will not be driven directly on the GCL or any overlying <br />geosynthetics. Unless otherwise specified by the Design Engineer, all equipment operating on soil <br />material overlying the GCL shall comply with the maximum allowable equipment ground pressures <br />for the given cover soil thickness provided in the Specifications. <br />Installation of the GCL in appurtenant areas, and connection of the GCL to appurtenances will be <br />made according to the drawings. The Geosynthetics Contractor will ensure that the GCL is not <br />damaged while working around appurtenances. <br />0 Page 45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.