My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r� <br />The quality assurance plan depends on thorough monitoring and documentation of all construction <br />activities. Therefore, the QA/QC Manager will document that all quality assurance requirements <br />have been addressed and satisfied. Documentation will consist of daily record keeping, testing and <br />installation reports, non-conformance reports (if necessary), progress reports, photographic records, <br />design and specification revisions, and a construction report. Report forms are to be provided by the <br />QA/QC Consultant. <br />6.1 Daily Record Keeping <br />At a minimum, daily records will consist of a daily record of construction progress, daily <br />construction report, observation and test data sheets, and, as needed, non-conformance/corrective <br />measure reports. All forms will have peer review. <br />6.1.1 Daily Record of Construction Progress <br />The daily field report will summarize ongoing construction and discussions with the Contractor and <br />will be prepared by the QA/QC Manager and QA/QC Inspectors. At a minimum, the report will <br />include the following: <br />• Date, project name, project number, and location <br />• A unique number for cross-referencing and document control. <br />® Weather data <br />• A description of all ongoing construction for the day. <br />• An inventory of equipment utilized by the Contractor. <br />• Items of discussion and names of parties involved in discussions. <br />• A brief description of tests and observations, identified as passing of failing, or, in the <br />event of failure, a retest. <br />• Areas of non-conformance/corrective actions, if any, (non-conformance/corrective action <br />form to be attached). <br />• Summary of materials received and quality documentation. <br />• Follow-up information on previously reported problems or deficiencies. <br />0 Page 53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.