My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® • A summary of work activities completed in the last week, and those expected to be <br />performed in the next week. <br />• A summary of deficiencies and/or defects, and resolutions. <br />• Ongoing summary of changed and/or change orders to the work. <br />• The signature of the QA/QC Manager. <br />• On fourth week of each month the report will include a summary on on-site and third <br />party laboratory test results. <br />6.3 Photographs <br />Construction activities will be photographed. Photographs will include any significant problems <br />encountered and corrective actions as will as document construction progress. The photographs will <br />be identified by number, location, time, date, and photographer. The photographer should document <br />the subject or the photograph, either on the back of the picture, or in a photograph log. One copy of <br />the photographs and the negatives will be given to the Owner. <br />6.4 Design and Specification Changes <br />Design and specification changes may be required during construction. Design and specification <br />changes will only be made with written agreement of the Design Engineer and Owner. These <br />changes will be made by change order to the contract. When change orders are issued, they will be <br />prepared by the Construction Manager. The Construction Manager will distribute change orders for <br />signature and execution to the required parties. <br />6.5 Final CQA Report <br />At the completion of the project, the QA/QC Manager will submit a final CQA report. This report <br />will document that the work has been performed in compliance with the Construction Drawings and <br />Specifications. <br />At a minimum, the report will contain: <br />• A summary of all construction activities. <br />• A summary of all laboratory and field test results. <br />• Sampling and testing location drawings <br />• A description of significant construction problems and the resolution of these problems. <br />0 Page 55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.