Laserfiche WebLink
C <br />• A list of changes from the Construction Drawings and Specifications and the <br />justifications for these changes. <br />• As -built record drawings. <br />• A statement that the interface shear strength meet or exceed the specified requirements. <br />If the interface shear strength results do not meet or exceed the specified requirements, <br />contact the Design Engineer and append a revised stability analysis, prepared by the <br />Design Engineer. <br />• A statement of compliance with the construction contract documents and design intent <br />signed and stamped by the QA/QC Manager, a professional engineer registered in the <br />state of California. <br />The as -built record drawings will accurately locate the constructed location of all work items, <br />including the edge of geomembrane, location of piping, anchor trenches, etc. All surveying and base <br />maps required for the development of the record drawings will be prepared by the Contractor and the <br />Owner. The QA/QC Manager must review and verify that as -built drawings are correct. As -built <br />record drawings will be included in the final CQA report. <br />Page 56 0 <br />