Laserfiche WebLink
SECTION %1 <br />NORTH SIDE SLOPE LINER - BASE LINER TRANSITION SHTS <br />NTS <br />DETAIL <br />SEE DETAIL <br />L <br />MATERIAL <br />SHTS <br />S -PERFORATED <br />PROTECTIVE <br />64-0 DOUBLE TEXTURED <br />HDPE LEACHATE <br />OPERATIONS LAYER <br />PROTECTIVE <br />GEOCO <br />(SEE NOTE 1) <br />OPERATIONS LAYER <br />DRAINAGGEE NET <br />6' PERFORATED <br />FILTER GEOTEXTILE <br />HDPE LEACHATE <br />COLLECTION PIPE ___ <br />GRANULAR DRAINAGE <br />1' MIN <br />- _ <br />MATERIAL <br />iL <br />21 <br />c <br />H, q <br />APPROX2 <br />:... <br />MIN <br />GEOSYNTHETIC/// <br />e9. o..vpo <br />a>� 7'MIN <br />CLAY LINER <br />ILTER <br />CUSHION GEOTEXTILE <br />NATIVE / <br />GROUND / <br />SMIN , 1 <br />2'MIN <br />III � 2 MIN _ <br />iB1 <br />64-11 SINGLE TEXTURED60 <br />HDPE GEOMEMBRANE <br />EXTRUSION WELD <br />ml DOUBLE TEXTURED <br />HOPE GEOMEMBRANE <br />(SEE NOTE 2) <br />------------ <br />CLAY LINER <br />10 MIN APPROX. 12' <br />CUSHION <br />2MIN <br />PREPARED JIII, <br />GEOTEXTILE <br />GEOTEXTILE <br />SECTION %1 <br />NORTH SIDE SLOPE LINER - BASE LINER TRANSITION SHTS <br />NTS <br />DETAIL <br />GRANULAR <br />DRAINAGE <br />PROTECTIVE <br />MATERIAL <br />OPERATIONS LAYER <br />S -PERFORATED <br />64-0 DOUBLE TEXTURED <br />HDPE LEACHATE <br />HDPE GEOMEMBRANE <br />COLLECTION PIPE <br />PROTECTIVEOPERATIONS <br />(SEE NOTE 3) <br />FILTER GEOTEXTILE <br />PLYWOOD SHEETING, <br />12 <br />TI'. <br />LAY CONTINUOUSLY <br />ALONG LINER TERMINATION <br />2'MIN <br />21 <br />c <br />H, q <br />2MIN <br />IN <br />=111i�Ill <br />1' MIN <br />GMIN <br />ILTER <br />CUSHION GEOTEXTILE <br />NATIVE / <br />GROUND / <br />APPROX. 12 FEET III LINER <br />SECTION <br />iB1 <br />1'MIN <br />LEACHATE COLLECTION TRENCH AND PIPE <br />SHT3 <br />. <br />NTS <br />FILTER <br />YMIN <br />2MIN <br />PREPARED JIII, <br />GEOTEXTILE <br />PROTECTIVE <br />GRANULAR DRAINAGE <br />=IJ_IIII <br />OPERATIONS LAYER <br />MATERIAL <br />V MIN <br />ILII= <br />CUSHION GEOTEXTILE <br />GRANULAR DRAINAGE <br />I'M N <br />2 MIN <br />MATERIAL <br />NATIVE <br />/ GROUND <br />CUSHION ^— <br />CUSHIOTILE <br />/ \ <br />GEOTFXGROUND <br />PLYWOOD <br />NATIVE <br />80 mA DOUBLE TEXTURED <br />SECTION <br />iC1 <br />HDPE GEOMEMBRANE <br />_ <br />BASE LINER TERMINATION <br />II�I�I�MN <br />SHT 3 <br />CLAY LINER <br />I NTS <br />DETAIL <br />i11 <br />GEOTEXTILE <br />BASE LINER DETAIL <br />NTS <br />BHT 3 <br />G <br />NOTES <br />1. THE FIRST 19 OF SIDE SLOPE PROTECTIVE OPERATION LAYER <br />SHALL BE PLACED BY THE CONTRACTOR USING WHEELED LOADER <br />MAIN NO EQUIPMENT LOADING ON THE SLOPE. SUBSEQUENT <br />LIFTS OF SIDE SLOPE PROTECTIVE OPERATIONS LAYER SHALL BE <br />PLACED BY THE OWNER IN CONDUCTION WITH WASTE PLACEMENT <br />TOA MAXIMUM HEIGHT OF 10' ABOVE THE LEVEL OF REFUSE. <br />SUBSEQUENT LIFTS SHALL ALSO BE PLACED WITH A WHEELED LOADER. <br />2. PLACE TEXTURED SIDE OF GEOMEMBRANE AGAINST CLAY LINER OR GCL. <br />3, PERFORATION PATTERN .Y- INCH DIAMETER HOLES AT PIPE THIRD <br />POINTS, SPACED &INCHES ON CENTER. <br />c <br />EDGE OF GEOMEMBRANE <br />FILTER <br />GEOTEXTILE <br />DETAIL <br />SHT7 <br />PROTECTIVEOPERATIONS <br />TERMINATION BERM <br />LAYER <br />PLYWOOD SHEETING, <br />12 <br />TI'. <br />LAY CONTINUOUSLY <br />ALONG LINER TERMINATION <br />21 <br />c <br />H, q <br />GMIN <br />ILTER <br />4'MN <br />2 <br />1 <br />2 GEOTEXTILE\ <br />1'MIN <br />. <br />YMIN <br />2MIN <br />PREPARED JIII, <br />�1% <br />_ SUBGRADE IIII—LI'— <br />—_� <br />PAIN <br />=IJ_IIII <br />WESTERN <br />/ EDGE OF } <br />�' CLAY LINER r <br />APP OX. 17 <br />ILII= <br />CUSHION GEOTEXTILE <br />GRANULAR DRAINAGE <br />` J <br />MATERIAL <br />NATIVE <br />/ GROUND <br />60 -mil DOUBLE TEXTURED <br />HOPE GEOMEMBRANE <br />/ \ <br />PLYWOOD <br />CLAY LINER <br />SECTION <br />iC1 <br />_ <br />BASE LINER TERMINATION <br />II�I�I�MN <br />SHT 3 <br />I NTS <br />GEOTEXTILE <br />G <br />NOTES <br />1. THE FIRST 19 OF SIDE SLOPE PROTECTIVE OPERATION LAYER <br />SHALL BE PLACED BY THE CONTRACTOR USING WHEELED LOADER <br />MAIN NO EQUIPMENT LOADING ON THE SLOPE. SUBSEQUENT <br />LIFTS OF SIDE SLOPE PROTECTIVE OPERATIONS LAYER SHALL BE <br />PLACED BY THE OWNER IN CONDUCTION WITH WASTE PLACEMENT <br />TOA MAXIMUM HEIGHT OF 10' ABOVE THE LEVEL OF REFUSE. <br />SUBSEQUENT LIFTS SHALL ALSO BE PLACED WITH A WHEELED LOADER. <br />2. PLACE TEXTURED SIDE OF GEOMEMBRANE AGAINST CLAY LINER OR GCL. <br />3, PERFORATION PATTERN .Y- INCH DIAMETER HOLES AT PIPE THIRD <br />POINTS, SPACED &INCHES ON CENTER. <br />c <br />