Laserfiche WebLink
• <br />�Z� o <br />SNiB ► <br />To <br />EL -1D <br />� TOP OF CLAY <br />EDDE OF CLAY LINER <br />ANDGEOMEMBRANE <br />f MIN 181 AMIN <br />HOPE TANK <br />BASE <br />� EL 2.10 <br />GLA <br />eNTB SNTB <br />3y1 / I <br />1 I I i <br />i31 <br />P MIN <br />8:1 <br />PP <br />L HOPE PERFORATED <br />LEUM X 6'HDPEPECOLLECTO <br />LEACHATE COLLEOTWN PIPE 3% 3% LEACHATE COLLECTION PIPE <br />PiEE NOTE 1) (SEE NOTE i) <br />_ 181 <br />P I <br />TVT TYP <br />6' HDPE PERFORATED <br />LEACHATE EE NOTE i) COLLECTION PIPE SEE DETAIL <br />(ST <br />1111\ FOR EASTERN EDGE <br />LEACHATE COLLECTION <br />TRENCH DETAIL <br />HDPE 45- CROSS <br />SEE DETAIL SLATS <br />'HT' I FOR LEACHATE <br />COLLECTION <br />i TRENCH DETAIL <br />PLAN DETAIL %41 <br />LEACHATE COLLECTION TEMPORARY SIAAP(TYPICAL) SHTS <br />NTS (SEE NOTE 3) <br />NOTE: GENERAL EARTHFILL OVER SUMP AND LINER <br />TERMINATION NOT SHOWN. (SEE SHEET 8) <br />C ] <br />GENERAL -� <br />EARTNF0.L PROTECMEOPERATIONS LAVER <br />2 <br />1� <br />O KHN <br />COARSE ORAVEI - FILTER GEOTEXTILE <br />L _ - <br />GRANULAR CUSHION GEOTEXTILE <br />:R OEOTEXTILE N a a DRDRAINAGE 1%1IN <br />3 Z 3 <br />MATERIAL <br />3'MIN T MIN VMWN <br />S 8 <br />8'HDPE PIPE 80-mATEXTURED <br />LUVLINER SDR B - PERFORATED HDPE OEpBEMBRANE <br />(SEE NOTE 1) <br />DETAIL <br />EASTERN EDGE LEACHATE BHT 4.T <br />COLLECTION TRENCH AND PIPE <br />NTS <br />RTES: <br />1. PERFORATION PATTERN: I2 INCH ODBAETER HOLES AT PIPE FOURTH POWTS. SPACED <br />64NCHES ON CENTER. CONTRACTOR TO PLACE CAP OVER UPGRADIENT END OF EACH PIPE. <br />3. S DIMENSIONS ARE MINIMUMS. CONTRACTORS MAY ADJUSTTO FACILITATE <br />CONSTRUCTION WITH PRIOR APPROVAL OF ENGINEER. <br />0 <br />LL <br />tu <br />ui <br />a <br />co) <br />N <br />