Laserfiche WebLink
® 0 • <br />FORWARD LANDFILL WMU FU -13 <br />NO ITEM <br />1 Mobilization/Demobilization <br />2 Provide Excavation of WMU FU -13 <br />Provide General Earthfill (in all required <br />3 locations not included within other bid items) <br />Provide Subgrade Fill (above existing cover <br />4 soil and refuse) <br />5 Provide Grading and Subgrade Preparation <br />6 Provide Clay Liner <br />7 Provide Granular Drainage Material <br />Provide 6 -inch Diameter SDR 11 HDPE <br />8 Leachate Collection Pipe (Perforated) <br />9 Provide HDPE Tanks <br />10 Provide Coarse Gravel <br />11 Install Protective Operations Layer <br />12 Provide Bench Berm (Section E) <br />Provide Slope Anchor Trench Excavation and <br />13 Slurry Cement Trench Backfill (Section D) <br />14 Provide Termination Berm (Section C) <br />15 Provide Top Deck Anchor Trench (Section M) <br />Provide General Earthfill Around HDPE Tanks <br />16 (Sections I, J) <br />17 Provide Top Deck Termination (Section L) <br />18 Provide 4'x 8'x 1/4" Plywood Sheeting <br />19 Provide Access Ramp <br />QUANTITY REVISED QUANTITY UNIT <br />W <br />86,000 CY <br />15,900 CY <br />197,500 <br />SF <br />445,100 <br />SF <br />181,000 <br />SF <br />227,600 <br />234,250 SF <br />2,100 <br />LF <br />2 <br />EA <br />610 <br />CY <br />252,000 <br />258,300 SF <br />970 <br />LF <br />405 LF <br />1,050 LF <br />785 LF <br />- LS <br />105 LF <br />- LS <br />1 LS <br />UNIT PRICE TOTAL <br />TOTAL <br />