Laserfiche WebLink
Scott Purdy <br />40rom: Sangeeta Lewis[lewisengineering@sbcglobal.net] <br />ent: Monday, July 08, 2013 6:01 PM <br />0: Scott Purdy <br />Subject: section m <br />Hi Scott, <br />I looked at Section M and although I would prefer construction was in accordance with the regulatory approved plans, I <br />am ok with extending the geomembrane that overlies the geogrid to overlap the 3 -ft wide clay plug anchor trench rather <br />than terminating it in the anchor trench. To be clear, this is the geomembrane that is between the clay plug berm and <br />FU -08 north (i.e. top deck liner) and not the geomembrane that is on the FU -13 north slope and terminates in the clay <br />plug anchor trench. In addition, the geogrid still needs to terminate within the anchor trench as shown on the plans. <br />Regards, <br />Sangeeta <br />v <br />n <br />