My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Final Construction Quality Assurance Report—WMU FU -13 <br />Forward Landfill <br />• 3.0 CONSTRUCTION QUALITY ASSURANCE PROGRAM <br />3.1 CONSTRUCTION COMPONENTS <br />GLA provided CQA services on both earthworks and geosynthetic components of the WMU FU - <br />13 construction. The earthwork tasks included excavation, buttress and subgrade fill, low <br />permeability soil liner placement, granular drainage materials installation, and protective <br />operations layer placement. The geosynthetics tasks included installing the geosynthetic clay <br />liner (GCL), high-density polyethylene (HDPE) geomembrane, geocomposite, geogrid, and <br />geotextile. <br />3.2 CQA DOCUMENTATION <br />CQA documentation was prepared by GLA as part of the prescribed CQA duties and consisted of <br />a system of daily record keeping including daily progress reports and a record of various test <br />data sheets pertinent to the soils and geosynthetic components of the liner system. <br />Tables 1 and 2, included in this report summarize the soils and geosynthetics testing <br />requirements per the CQA Manual and Technical Specifications. Within each of the tables, <br />. information on the construction material type, the total quantity of material placed on the <br />project, the test designation to be performed, the specified testing frequency, the required <br />number of tests to be conducted, the actual number of tests conducted, and the actual testing <br />frequency is listed. As shown on the tables, the actual materials testing frequency on the <br />project satisfies the number of tests required by the CQA Manual. These tables are part of <br />GLA's internal quality control program to ensure that the testing and required testing <br />frequencies are satisfied on the project. <br />Other CQA documentation with respect to test data and observation sheets are discussed <br />within the following sections. Copies and summaries of various data for the soils and <br />geosynthetics components monitored and physically tested by GLA are included in various <br />appendices of this report. Documentation of the conformance tests for the geosynthetic <br />components is also presented. <br />3.3 DESIGN MODIFICATIONS <br />During the construction of WMU FU -13, modifications to the contract drawings and <br />specifications occurred. The approved modifications during construction of WMU FU -13 are <br />included in Appendix A and are described below: <br />• <br />Geo -Logic <br />ASSOCIATES <br />
The URL can be used to link to this page
Your browser does not support the video tag.