• <br />Geo-Losic <br />ASS0CIATES <br />CQA DAILY SUMMARY REPORT #003 <br />REPUBLIC SERVICES FORWARD LANDFILL# FU -13 <br />Location: <br />Manteca, CA Owner: <br />Republic Services <br />CQA Consultant: <br />Geologic Associates Contractors: <br />Guinn Construction <br />Prepared by: <br />Jose Armenta (GLA) <br />Comanco Environmental Corp. <br />Submitted to: <br />Scott Purdy (GLA) <br />Project #: <br />2013-AO55 <br />Report No.: 003 <br />Report Date: Monday May 20, 2013 <br />Onsite: 07:00 - 17:30 Hrs <br />Weather: AM: 69 <br />°F Clear <br />PM: 87°F Clear <br />Guinn Construction Activities: <br />• Guinn construction continued clearing work along the existing North Slope tie-in line exposing WMU-FU 8 <br />synthetic liner. <br />• The Contractor continued buttress fill placement using material from cut floor area. The Contractor <br />performed continuous moisture conditioning and sheepsfoot compaction work. <br />Personnel: 1 Superintendent, (1) Grade Checker, (8) Operators, (3) Laborers. <br />Equipment: (1) 825 Cat Sheepsfoot compactor, (1) 140H Cat Motor -Grader, (2) Water trucks, (1) Cat Excavator, <br />(3) D6 Cat Dozers, (4) 637 Cat Scrapers, (1) Cat Fork-lift. <br />CQA (GLA) Activities: Field Personnel (1) <br />• CQA personnel performed continuous monitoring and lab and field moisture -density testing of the buttress fill <br />placement. <br />• CQA personnel monitored excavation work in the Cell floor; performed visual soil classification with the intent <br />to save any possible suitable clay material encountered. <br />• CQA personnel monitored the clearing work being performed along the North Slope tie-in line exposing the <br />existing synthetic liner. <br />Meetings and Site Discussions: <br />• Met with Ruben (Forward LF Site Manager) and Kevin (Guinn Superintendent) in the morning to discuss <br />planned activity for the work shift. The Contractor would continue buttress fill along the WMU-8 existing <br />• slope. The Contractor would continue exposing the liner tie-in along the north side of WMU-FU13. The <br />Contractor would continue dust control. <br />PAGE 1 OF 2 <br />