Geo -Lo <br />iC <br />ASSOCIATES) <br />• CQA DAILY SUMMARY REPORT #006 <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />Location: <br />Manteca, CA Owner: <br />Republic Services <br />CQA Consultant: <br />Geologic Associates Contractors: <br />Guinn Construction <br />Prepared by: <br />Jose Armenta (GLA) <br />Comanco Environmental Corp. <br />Submitted to: <br />Scott Purdy (GLA) <br />Project #: <br />2013-AO55 <br />Report No.: 006 <br />Report Date: Thursday May 23, 2013 <br />Onsite: 06:00 - 16:30 Hrs <br />Weather: AM: 59 <br />OF Clear <br />PM: 82°F Clear <br />Guinn Construction Activities: <br />• The contractor continued cleaning work along the north tie-in line, continued removing liner debris <br />embedded in material stockpiled along tie-in with front end loader and two laborers. <br />The Contractor continued buttress fill placement using material from cut floor area; performed continuous <br />moisture conditioning and sheepsfoot compaction work. <br />. . The Contractor continued excavating floor. <br />Personnel: (1) Superintendent, (1) Grade Checker, (7) Operators, (2) Laborers. <br />Equipment: (1) 825 Cat Sheepsfoot compactor, (1) 140H Cat Motor -Grader, (2) Water trucks, (1) Cat Excavator, <br />(3) D6 Cat Dozers, (4) 637 Cat Scrapers, (1) Cat Fork-lift. <br />Meetings and Site Discussions: <br />• Met with Kevin Turner (Guinn Superintendent) in the morning to discuss planned activity for the work shift. <br />The Contractor would continue buttress fill along the WMU-8 existing slope and the WMU FU13 floor <br />excavation. The Contractor would perform cleaning work (debris removal) along the liner tie-in in the north <br />side of WMU-FU13. The Contractor would continue dust control. <br />Site Visitors: <br />• None <br />0 <br />