Laserfiche WebLink
Geo -Logic <br />ASS0CIATESV <br />CQA DAILY SUMMARY REPORT #011 <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />• Met with Kevin Turner (Guinn Superintendent) in the morning to discuss planned activity for the work shift. <br />The Contractor would continue WMU FU13 floor excavation. The Contractor would continue slope finishing <br />work. The Contractor would start excavation of the LCRS trenches on subgrade. <br />Site Visitors: <br />• None <br />Photos: <br />Fig.1 Looking west on east side of FU 13. <br />is <br />