Laserfiche WebLink
• <br />Geo -Logic <br />ASS0CIATESV <br />CQA DAILY SUMMARY REPORT #019 <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />Location: <br />Manteca, CA Owner: <br />Republic Services <br />CQA Consultant: <br />Geologic Associates Contractors: <br />Guinn Construction <br />Prepared by: <br />Jose Armenta (GLA) <br />Comanco Environmental Corp. <br />Submitted to: <br />Scott Purdy (GLA) <br />Project #: <br />2013-AO55 <br />Report No.: 019 <br />Report Date: Wednesday June 12, 2013 <br />Onsite: 06:00 - 16:30 Hrs <br />Weather: AM: 58 <br />OF Clear <br />PM: 90°F Clear <br />Guinn Construction Activities: <br />• The Contractor expanded the clay borrow area to the east; removed approximately 3,200 CY of top soil. The <br />contractor will continued clay processing by Friday 06/14. <br />• The Contractor continued using laborers with rakes and shovels to groom 2:1 side slope in FLI-13; continued <br />removing loose rocks, clods, and filling in small divots. <br />• . The Contractor performed cleaning work along the north synthetic liner tie-in; used laborers with rakes and <br />shovels and a motor grader. <br />• The Contractor continued moisture conditioning of haul roads and adjacent areas for dust control. <br />Personnel: (1) Superintendent, (1) Grade Checker, (10) Operators, (3) laborers. <br />Equipment: (1) 825 Cat Sheepsfoot compactor, (1) 140H Cat Motor -Grader, (2) Water trucks, (1) Cat Excavator, <br />(3) D6 Cat Dozers, (5) 637 Cat Scrapers, (1) Cat Fork-lift. <br />CQA (GLA) Activities: Field Personnel (1) <br />• CQA personnel performed continuous monitoring of all construction activities insuring conformance with the <br />project specifications. <br />• CQA personnel monitored clay processing operation at all times insuring suitability of soil material and proper <br />moisture conditioning. <br />• CQA personnel continued visual and lab soil classification testing of clay soil material from borrow area. <br />0 Meetings and Site Discussions: <br />