• <br />Geo-Losic <br />ASSOCIATES <br />CQA DAILY SUMMARY REPORT #020 <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />Location: Manteca, CA Owner: Republic Services <br />CQA Consultant: Geologic Associates Contractors: Guinn Construction <br />Prepared by: Jose Armenta (GLA) Comanco Environmental Corp. <br />Submitted to: Scott Purdy (GLA) <br />Project #: 2013-AO55 <br />Report No.: 020 Report Date: Thursday June 13, 2013 Onsite: 06:00 - 16:30 Hrs <br />Weather: AM: 59 OF Clear PM: 89°F Clear <br />Guinn Construction Activities: <br />• The Contractor started excavation of the 3x3 ft liner anchor trench on the west slope using an excavator and <br />a spotter. <br />• The Contractor continued subgrade work along the north and west synthetic liner tie-in; used laborers with <br />rakes and shovels and a motor grader. <br />• The Contractor removed loose soil from the bottom of the LCRS trenches in the NE area of the Cell. <br />• The Contractor continued moisture conditioning of haul roads and adjacent areas for dust control. <br />Personnel: (1) Superintendent, (1) Grade Checker, (4) Operators, (3) laborers. <br />Equipment: (1) 825 Cat Sheepsfoot compactor, (1) 140H Cat Motor -Grader, (2) Water trucks, (1) Cat Excavator, <br />(3) D6 Cat Dozers, (5) 637 Cat Scrapers, (1) Cat Fork-lift. <br />CQA (GLA) Activities: Field Personnel (1) <br />• CQA personnel performed continuous monitoring of all construction activities insuring conformance with the <br />project specifications. <br />• CQA personnel monitored subgrade work along the liner tie-in in FU -13. <br />• CQA personnel continued visual and lab soil classification testing of clay soil material from borrow area. <br />Meetings and Site Discussions: <br />• Met with Kevin Turner (Guinn Superintendent) in the morning to discuss planned activity for the work shift. <br />• The Contractor would concentrate efforts on the top of the west and north slopes subgrade and the liner <br />anchor trench excavation. <br />PAGE 1 OF 2 <br />