My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Geo-Losic <br />ASSOCIATES <br />CQA DAILY SUMMARY REPORT #020 <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />Location: Manteca, CA Owner: Republic Services <br />CQA Consultant: Geologic Associates Contractors: Guinn Construction <br />Prepared by: Jose Armenta (GLA) Comanco Environmental Corp. <br />Submitted to: Scott Purdy (GLA) <br />Project #: 2013-AO55 <br />Report No.: 020 Report Date: Thursday June 13, 2013 Onsite: 06:00 - 16:30 Hrs <br />Weather: AM: 59 OF Clear PM: 89°F Clear <br />Guinn Construction Activities: <br />• The Contractor started excavation of the 3x3 ft liner anchor trench on the west slope using an excavator and <br />a spotter. <br />• The Contractor continued subgrade work along the north and west synthetic liner tie-in; used laborers with <br />rakes and shovels and a motor grader. <br />• The Contractor removed loose soil from the bottom of the LCRS trenches in the NE area of the Cell. <br />• The Contractor continued moisture conditioning of haul roads and adjacent areas for dust control. <br />Personnel: (1) Superintendent, (1) Grade Checker, (4) Operators, (3) laborers. <br />Equipment: (1) 825 Cat Sheepsfoot compactor, (1) 140H Cat Motor -Grader, (2) Water trucks, (1) Cat Excavator, <br />(3) D6 Cat Dozers, (5) 637 Cat Scrapers, (1) Cat Fork-lift. <br />CQA (GLA) Activities: Field Personnel (1) <br />• CQA personnel performed continuous monitoring of all construction activities insuring conformance with the <br />project specifications. <br />• CQA personnel monitored subgrade work along the liner tie-in in FU -13. <br />• CQA personnel continued visual and lab soil classification testing of clay soil material from borrow area. <br />Meetings and Site Discussions: <br />• Met with Kevin Turner (Guinn Superintendent) in the morning to discuss planned activity for the work shift. <br />• The Contractor would concentrate efforts on the top of the west and north slopes subgrade and the liner <br />anchor trench excavation. <br />PAGE 1 OF 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.