• <br />Geo-Losic <br />A S S O C I AT E S <br />CQA DAILY SUMMARY REPORT #023 <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />Location: <br />Manteca, CA Owner: <br />Republic Services <br />CQA Consultant: <br />Geologic Associates Contractors: <br />Guinn Construction <br />Prepared by: <br />Jose Armenta (GLA) <br />Comanco Environmental Corp. <br />Submitted to: <br />Scott Purdy (GLA) <br />Project #: <br />2013-AO55 <br />Report No.: 023 <br />Report Date: Tuesday June 18, 2013 <br />Onsite: 07:00 - 17:30 Hrs <br />Weather: AM: 56 <br />OF Clear <br />PM: 86°F Clear <br />Guinn Construction Activities: <br />• The Contractor completed work in the clay borrow and stockpile areas; performed ripping, moisture <br />conditioning, and excavation. <br />• The Contractor completed transferring clay material to the clay stockpile located along the south limits of FU - <br />13. The Contractor performed continuous moisture conditioning with disc and two water trucks. <br />• • The Contractor continued moisture conditioning of haul roads and adjacent areas for dust control. <br />Personnel: (1) Superintendent, (1) Grade Checker, (10) Operators. <br />Equipment: (1) 140H Cat Motor -Grader, (3) Water trucks, (1) Cat Excavator, (3) D6 Cat Dozers, (5) 637 Cat <br />Scrapers, (1) Cat Fork-lift. <br />CQA (GLA) Activities: Field Personnel (1) <br />• CQA personnel performed continuous monitoring of all construction activities insuring conformance with the <br />project specifications. <br />• CQA personnel monitored clay processing operation at all times insuring suitability of soil material and proper <br />moisture conditioning. <br />• CQA personnel performed visual and lab soil classification testing of clay soil material being stockpiled. <br />Meetings and Site Discussions: <br />• Met with Kevin Turner (Guinn Superintendent) in the morning to discuss planned activity for the work shift. <br />The Contractor would complete processing and stockpiling of clay soil material. The Contractor claims to <br />• have stockpiled enough clay soil material to complete clay liner on the Cell floor and the clay plug on the <br />upper slope. <br />PACE 1 OF 2 <br />