Laserfiche WebLink
Geo -Logic <br />A S S 0 C I A T E S <br />CQA DAILY SUMMARY REPORT #025 <br />• <br />REPUBLIC SERVICES FORWARD LANDFILL, <br />FU -13 <br />Location: Manteca, CA Owner: <br />Republic Services <br />CQA Consultant: Geologic Associates Contractors: <br />Guinn Construction <br />Prepared by: Jose Armenta (GLA) <br />Comanco Environmental Corp. <br />Submitted to: Scott Purdy (GLA) <br />Project #: 2013-AO55 <br />Report No.: 025 Report Date: Thursday June 20, 2013 <br />Onsite: 06:00 - 17:30 Hrs <br />Weather: AM: 61 OF Clear <br />PM: 88°F Clear <br />Guinn Construction Activities: <br />• The Contractor removed old LCRS sump at the FU -10 tie-in and installed a leachate trap and temporary <br />piping to nearby leachate tank. <br />• The Contractor performed moisture conditioning and work with the smooth drum roller on the west and <br />north 3:1 slope. <br />• The Contractor continued moisture conditioning of haul roads and adjacent areas for dust control. <br />Personnel: (1) Superintendent, (1) Grade Checker, (10) Operators. <br />Equipment: (1) 140H Cat Motor -Grader, (3) Water trucks, (1) Cat Excavator, (3) D6 Cat Dozers, (5) 637 Cat <br />Scrapers, (1) Cat Fork-lift. <br />CQA (GLA) Activities: Field Personnel (1) <br />• CQA personnel performed continuous monitoring of all construction activities insuring conformance with the <br />project specifications. <br />• CQA personnel performed lab testing of clay soil material stockpiled along the south limits of the Cell. <br />Meetings and Site Discussions: <br />• Met with Kevin Turner (Guinn Superintendent) in the morning to discuss planned activity for the work shift. <br />The Contractor would be working on slope subgrade. The contractor would remove the old LCRS sump <br />adjacent to the tie-in line in FU -10. <br />• Site Visitors: <br />0 None <br />