Laserfiche WebLink
Geo-Loqk <br />A S S O C I AT E S <br />CQA DAILY SUMMARY REPORT #027 <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />• CQA personnel monitored and documented the offloading and storage of synthetic liner material being <br />transferred to the site. CQA personnel insured that the handling and storage of the synthetic liner was <br />performed in accordance with the project specifications. <br />Meetings and Site Discussions: <br />• Met with Kevin Turner (Guinn Superintendent) in the morning to discuss planned activity for the work shift. <br />The Contractor would continue offloading and storing synthetic liner material. The Contractor would start <br />placement of clay liner along the south of the Cell and the LCRS trenches. <br />Site Visitors: <br />• None <br />Photos: <br />Fig.1 Looking SW on FU13 floor; moisture conditioning and proof rolling of clay subgrade. <br />• <br />