My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geo-Losic <br />ASS0CIATES <br />CQA DAILY SUMMARY REPORT #028 <br />REPUBLIC SERVICES FORWARD LANDFILLf FU -13 <br />• CQA personnel monitored and documented the offloading and storage of synthetic liner material being <br />transferred to the site. CQA personnel insured that the handling and storage of the synthetic liner was <br />performed in accordance with the project specifications. <br />Meetings and Site Discussions: <br />Met with Kevin Turner (Guinn Superintendent) in the morning to discuss planned activity for the work shift. <br />The Contractor would continue offloading and storing synthetic liner material. The Contractor would continue <br />placement of clay liner in the south half of the Cell and the LCRS trenches. <br />• CQA personnel attended the weekly project progress meeting held in the front entrance facility; refer to the <br />CQA project progress meeting minutes. <br />Site Visitors: <br />None <br />Photos: <br />is <br />Fig.1 Looking SW on FU 13 floor; in-situ clay sampling for lab permeability testing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.