My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />Geo -Logic <br />A S S d C I AT E Ste./ <br />CQA DAILY SUMMARY REPORT #029 <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />Location: Manteca, CA Owner: Republic Services <br />CQA Consultant: Geologic Associates Contractors: Guinn Construction <br />Prepared by: Jose Armenta (GLA) Comanco Environmental Corp. <br />Submitted to: Scott Purdy (GLA) <br />Project #: 2013-AO55 <br />Report No.: 029 Report Date: Wednesday June 26, 2013 <br />Weather: AM: 59°F P. Cloudy <br />Guinn Construction Activities: <br />• The Contractor continued clay placement across the Cell floor. <br />Onsite: 06:00 - 17:30 Hrs <br />PM: 78°F P. Cloudy <br />The Contractor performed moisture conditioning of clay material in the clay borrow using a tractor with disc <br />and two water trucks. <br />• The Contractor performed continuous moisture conditioning and sheepsfoot compaction during clay <br />placement. The Contractor used a D6 Cat dozer and a motor grader equipped with GPS for lift thickness <br />control. <br />• The Contractor continued offloading synthetic liner material on the NE side of FLI-13. <br />• The Contractor performed continuous moisture conditioning of haul roads and adjacent areas for dust <br />control. <br />Personnel: (1) Superintendent, (1) Grade Checker, (10) Operators, (3) Laborers. <br />Equipment: (1) 825 Cat Sheepsfoot compactor, (1) 140H Cat Motor -Grader, (3) Water trucks, (1) Cat Excavator, <br />(3) D6 Cat Dozers, (5) 637 Cat Scrapers, (1) Cat Fork-lift. <br />CQA (GLA) Activities: Field Personnel (2) <br />• CQA personnel performed continuous monitoring of all construction activities insuring conformance with the <br />project specifications. <br />• CQA personnel continuously monitored the placement of clay material insuring proper lift thickness, <br />uniformity of moisture, and compaction during placement. CQA personnel performed field moisture -density <br />testing of the compacted clay material in accordance with the project specifications; obtained in-situ clay <br />samples for lab permeability testing. <br />• CQA personnel monitored and documented the offloading and storage of synthetic liner material being <br />transferred to the site. CQA personnel insured that the handling and storage of the synthetic liner was <br />performed in accordance with the project specifications. <br />
The URL can be used to link to this page
Your browser does not support the video tag.