Laserfiche WebLink
Geo-LoqkASSOCIATE <br />CQA DAILY SUMMARY REPORT # <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />CQA (GLA) Activities: Field Personnel (2) <br />• CQA personnel performed continuous monitoring and documentation of all construction activities insuring <br />conformance with the project specifications. <br />• CQA personnel continued monitoring the grading work and the moisture conditioning of the exposed clay <br />surface throughout the work -shift. <br />• CQA personnel monitored work on the HDPE liner at all times insuring that proper procedures were used to <br />prevent damage to the underlying synthetic liner. CQA monitored and inspected all HDPE liner repairs for <br />cleanliness, minimum overlap, and the implementation of proper welding procedures. <br />• CQA personnel marked seam destructive samples of HDPE production seaming to -date. Seam destructive <br />tests are performed on site by CQA personnel. <br />• CQA personnel monitored and documented non-destructive air pressure and vacuum testing of HDPE hot <br />wedge fusion and extrusion welds. <br />Meetings and Site Discussions: <br />• Met with Kevin Turner (Guinn Construction Superintendent) and Jose Hernandez (Comanco Superintendent) <br />in the morning to discuss planned activity for the work shift. Comanco would concentrate efforts on the <br />testing and repair work of the HDPE on the slope. <br />• Guinn Construction would continue grading work on clay surface; would continue moisture conditioning <br />exposed clay surface. <br />Site Visitors: <br />• None <br />Photos: <br />PAGE 2OF3 <br />• <br />• <br />