Laserfiche WebLink
Geo -Logic <br />A S S O C I AT E SV <br />CQA DAILY SUMMARY REPORT <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />• CQA personnel performed a final walkthrough inspection with the liner CQC personnel over the HDPE liner <br />surface upon completing cleaning work prior to the geocomposite installation. <br />• CQA personnel monitored the installation of the geocomposite at all times ensuring proper handling, panel <br />orientation on the slope, tying and seaming methods, and that proper procedures were used to prevent <br />damage to the underlying synthetic liner. <br />Meetings and Site Discussions: <br />• Met with Jose Hernandez (Comanco Superintendent) in the morning to discuss planned activity for the work <br />shift. The Contractor would start installation of the Geocomposite on the west 4:1 slope. <br />Site Visitors: <br />• None <br />Photos: <br />Fig.1 Single sided Geocomposite installation on FU13 2:1 and 4:1 slopes. <br />PAGE 2OF3 <br />• <br />