Laserfiche WebLink
Geo-Losic <br />ASS 0CIATES <br />CQA DAILY SUMMARY REPORT <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />• Personnel: 12 <br />• Equipment: (1) Fork Lift, (1) equipment trailer, (1) Van, (3) Trucks <br />CQA (GLA) Activities: Field Personnel (2) <br />• CQA personnel performed continuous monitoring and documentation of all construction activities insuring <br />conformance with the project specifications. <br />CQA personnel performed a final walkthrough inspection with the liner CQC personnel over the HDPE liner <br />surface upon completing cleaning work prior to the geocomposite and the geotextile installation. <br />• CQA personnel monitored the installation of the geocomposite and the 12 -oz geotextile at all times ensuring <br />proper handling, panel orientation on the slope, tying and seaming methods, and that proper procedures <br />were used to prevent damage to the underlying synthetic liner. <br />• CQA personnel monitored the backfill of the liner anchor trench at all times ensuring that proper procedures <br />were used to minimize and prevent damage to the adjacent synthetic liner. 0 <br />• CQA personnel performed two nuclear moisture -density tests on clay plug fill in the liner anchor trench <br />obtaining positive results. <br />Meetings and Site Discussions: <br />• Met with Kevin Turner (Guinn Construction Superintendent) and Jose Hernandez (Comanco Superintendent) <br />in the morning to discuss planned activity for the work shift. <br />• Guinn Construction would continue liner anchor trench backfill. <br />• Comanco would continue installation of the Geocomposite on the north 2:1 slope; would continue installation <br />of the cushion geotextile on the Cell floor. <br />Site Visitors: <br />• None <br />Photos: <br />PAGE 2OF3 <br />