My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Geo -Logic <br />ASSOCIATES <br />CQA DAILY SUMMARY REPORT #052 <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />Location: Manteca, CA Owner: Republic Services <br />CQA Consultant: Geologic Associates Contractors: Guinn Construction <br />Prepared by: Jose Armenta (GLA) Comanco Environmental Corp. <br />Submitted to: Scott Purdy (GLA) <br />Project #: 2013-AO55 <br />Report No.: 052 Report Date: Wednesday July 24, 2013 Onsite: 06:00 - 16:30 Hrs <br />Weather: AM: 64°F Clear PM: 97°F Clear <br />Guinn Construction Activities: <br />• The Contractor started placement of the granular drainage layer along the south side of the Cell. The <br />drainage gravel was transferred with belly dump trucks from the quarry and placed on the unloader <br />conveyor to be transferred over the lined area. The DGM was spread in a continuous 12 -inch lift with a D6 <br />Cat LGP Dozer equipped with GPS for grade control over the cushion 12 -oz geotextile. <br />• Personnel: (1) Superintendent, (1) Grade Checker, (10) Operators, (2) Laborers. <br />Equipment: (1) 140H Cat Motor -Grader, (1) Water truck, (1) Cat Excavator, (1) D6N Cat Dozer, (1) D6R Cat <br />Dozer, (2) 637 Cat Scrapers, (1) Cat Fork-lift, (1) Rock unloader conveyor, (1) 740 Cat Rock Truck. <br />CQA (GLA) Activities: Field Personnel (2) <br />• CQA personnel performed continuous monitoring and documentation of construction activities insuring <br />conformance with the project specifications. <br />• CQA personnel monitored the placement of the granular drainage at all times insuring that proper <br />procedures were used to prevent damage to the underlying synthetic liner. <br />Meetings and Site Discussions: <br />• Met with Kevin Turner (Guinn Superintendent) in the morning to discuss planned activity for the work shift. <br />The Contractor would start placement of the drainage gravel layer on the south half of the Cell floor. <br />Site Visitors: <br />•• None <br />i <br />
The URL can be used to link to this page
Your browser does not support the video tag.