My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geo-Logis <br />ASS0CIATES <br />• CQA DAILY SUMMARY REPORT #066 <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />Location: Manteca, CA Owner: Republic Services <br />CQA Consultant: Geologic Associates Contractors: Guinn Construction <br />Prepared by: Jose Armenta (GLA) Comanco Environmental Corp. <br />Submitted to: Scott Purdy (GLA) <br />Project #: 2013-AO55 <br />Report No.: 066 Report Date: Monday August 12, 2013 Onsite: 07:00 - 17:30 Hrs <br />Weather: AM: 61°F Clear PM: 95°F Clear <br />Guinn Construction Activities: <br />The Contractor performed east side liner termination slurry fill today. <br />• The Contractor started placement of the 12 -inch operations soil layer over on the north slope bench starting <br />from the east end. The Contractor used a 760 Cat rock truck to transfer the soil material and a D6 Cat dozer <br />equipped with GPS was used to spread the soil material to the required thickness. <br />Personnel: (4) Operators, (1) Supervisor, (1) Grade checker.. <br />Equipment: (1) Water truck, (2) 637 Cat Scrapers, (1) D6N Cat Dozer, (1) D6R LGP Cat Dozer, (1) 966 Cat <br />Loader, (1) 14H Cat Motor grader, (1) Cat Fork Lift, (1) Generator, (2) Leister Heat Guns. <br />CQA (GLA) Activities: Field Personnel (1) <br />• CQA personnel performed continuous monitoring of all construction activities ensuring conformance with the <br />project specifications. <br />• CQA monitored the placement of the OPS layer at all times ensuring that proper lift thickness was <br />maintained and that care was taken to prevent damage to the underlying synthetic layers. <br />Meetings and Site Discussions: <br />• Met with Kevin (Guinn Superintendent) in the morning to discuss planned activity for the work shift. The <br />Contractor would start soil placement on slope bench; will slurry fill east side slope liner anchor trench. <br />•Site Visitors: <br />None <br />Photos: <br />
The URL can be used to link to this page
Your browser does not support the video tag.