My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geo-LoqkASS0CIATES <br />CQA WEEKLY SUMMARY REPORT #0 <br />FOWARD LANDFILL, WMU FU -13 <br />• CQA personnel performed continuous monitoring of field construction activity insuring conformance with the <br />project CQA plan and design drawings. <br />• CQA personnel performed continuous monitoring of the clay soil placement insuring proper lift thickness and <br />that uniform moisture and compaction was performed. CQA personnel performed lab and field testing of the <br />clay material being placed. <br />• CQA personnel obtained in situ clay samples from the clay layer per the project specifications for lab <br />permeability testing. <br />• CQA personnel performed continuous monitoring and documentation of synthetic liner material transferred <br />to the site. CQA personnel observed handling and storage of the synthetic liner materials to be in <br />conformance with the project specifications. <br />CQA personnel met with Comanco personnel on site and performed preliminary walk on slope subgrade. <br />The project weekly progress meeting was held on site on Tuesday June 25th in the front entrance facility; <br />refer to the CQA weekly project progress meeting minutes. <br />Weekly Synthetic Liner Quantities: <br />• <br />Geo rid <br />GCL <br />HDPE <br />Geotextile <br />Drain Rock <br />(sf) <br />(sf) <br />(sf) <br />(sf) <br />(c <br />Photo: <br />PAGE 2OF3 <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.