Laserfiche WebLink
• <br />• <br />:7 <br />Geo-LoqkASSOC IATES <br />CQA WEEKLY SUMMARY REPORT #013 <br />FOWARD LANDFILL, WMU FU -13 <br />• CQA personnel performed dipole leak detection testing on Cell floor over the OPS layer <br />The project weekly progress meeting was held on site on Tuesday August 6th in the front entrance facility; <br />refer to the CQA weekly project progress meeting minutes. <br />Weekly Synthetic Liner Quantities: <br />Filter Geotextile <br />Cushion Geotextile <br />Geocom osite <br />Drain Rock <br />21,000 (sf) <br />0 (sf) <br />0 (sf) <br />3100 c <br />Photo: <br />}jf-lGfE 2 OF 2- <br />Fig.1 Looking northwest, FU -13. <br />