Laserfiche WebLink
® - Based on the clay testing results by GLA within the WMU excavation, it does not <br />appear like suitable material will be found in that area. Guinn has moved 400 feet <br />to the east and potholed for clay. GLA is currently testing this material. <br />5. Issues which impede the construction schedule and corrective measures: <br />- Republic (Ruben) needs to order the geogrid. GLA will contact Sangeeta on the <br />quantity. In addition, the overlap requirements for the geogrid will be verified. A <br />minimum of three feet is specified for the butt seams, but the overlap for the sides <br />needs to be verified. Based on the amount of material and overlap, Comanco will <br />determine the waste percentage to give Ruben the total amount of geogrid to <br />order. <br />6. Review of submittals and RFI's: <br />- Buck provided the survey points on the floor of the cell with the flow lines <br />included. This drawing was accepted and it was noted that the control points in the <br />flow line were for subgrade and top of clay only and not for the LCRS gravel or <br />operations soil. <br />- Guinn is working on the leachate tank submittal and will also be providing the <br />submittal on the piping. <br />r7. Review of CQA activities-; <br />• <br />- GLA is running Proctor tests on the soils and using the results for the in-place <br />nuclear density testing. The moisture and density testing of the embankment fill <br />placement is going according to the specifications. <br />- GLA is continuing to conduct soils testing on the fill materials per the specified <br />frequency. <br />- GLA (Scott) delivered clay pothole samples to their geotechnical laboratory for <br />evaluation. <br />8. Health and safety/Environmental issues: <br />- Guinn/GLA/Republic reported no health and safety issues for the week. <br />- Guinn will provide copies of the weekly tailgate safety meetings to the Forward <br />front office who will make copies and email to Lochlin. <br />- Republic provided a copy of the Emergency Response Plan to all parties. A copy <br />has been attached to these meeting minutes. <br />- Guinn/Republic reported no dust control issues. <br />- Ruben reported that the Water Board inspector recently toured the site and that <br />the LEA will be conducting monthly inspections. <br />Forward Landfill WMU FU -13 <br />Progress Meeting Minutes Page 3 <br />