My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- GLA will get a clarification on Section M of the construction drawings from the <br />design engineer regarding placement of the upper geomembrane in the anchor <br />trench. <br />- GLA is observing that Guinn is providing adequate moisture to the clay liner to <br />keep it from desiccating. <br />- Guinn will let GLA know their plans for seaming the geotextile (lyster, overlap, or <br />sew). <br />8. Health and safety/Environmental issues: <br />- Guinn/GLA/Republic reported no health and safety issues for the week. <br />- Guinn will continue to provide copies of the weekly tailgate safety meetings to <br />the Forward front office who will make copies and email to Lochlin. <br />- Republic provided copies of the previous health and safety meetings to GLA. <br />Copies have been attached to these meeting minutes. <br />- Guinn/Republic reported no dust control issues. <br />- GLA will continue to provide weekly progress reports and CQA reports to Ross at <br />the RWQCB. <br />- GLA stressed the importance of staying hydrated in the very warm weather. <br />9. Other items: 0 <br />-- Guinn will be taking July 4th and 5th off for the holiday. Comanco will continue to <br />work during this period. <br />- Ruben with Republic would like a 10% road built into the cell at the end of <br />construction to facilitate waste placement. Guinn will provide an estimate to <br />conduct this work. <br />- The existing tie-in on the southwest corner has geocomposite that has <br />undergone some degradation in the sun. Comanco, GLA, and Republic will go out <br />to this area and evaluate the geocomposite to determine if the material needs to be <br />replaced. <br />The weekly construction meeting for next week has been rescheduled for <br />Wednesday, July 10th at 11 am. <br />Forward Landfill WMU FU -13 <br />Progress Meeting Minutes Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.