My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- Guinn finished placing operations layer over approved filter geotextile on top <br />portion of the cell. 0 <br />- Guinn placed operations soil on the bench. <br />- Guinn placed operations soil ten feet up the slope from the cell floor. <br />- Guinn completed the termination berm after the leak location testing was <br />complete. <br />3. Projected schedule: <br />- Guinn will place aggregate base on the access ramp. <br />- Guinn will finish operations soil placement on the bench. <br />- Guinn will conduct general clean-up. <br />- RJA will provide surveying as-builts for the second half of the cell by August 20th. <br />- GLA will work with Guinn along the northeast termination to divert stormwater <br />flow along the bench and keep it from flowing directly into the geocomposite. <br />- Republic (Ruben) will take any remaining materials. <br />- A total of 4 rolls of geogrid is remaining following installation. <br />- Project completion is estimated to be August 19tH <br />4. Field observations, problems, conflicts, and changes: <br />- The sump needs to be pumped approximately every 4 days. Republic will <br />provide pumping service and the work has been placed in the operations <br />schedule. <br />5. Issues which impede the construction schedule and corrective measures: <br />- None. <br />6. Review of submittals and RFI's: <br />- No submittals or RFI's are outstanding. <br />7. Review of CQA activities: <br />- GLA is observing Guinn's construction activities. <br />- GLA is observing placement of the filter geotextile. <br />- GLS is observing the placement of the drainage material. <br />- GLA is observing the placement of the operations layer. <br />- GLA is working with Guinn to ensure that all of the punch list items have been <br />taken care off. <br />n <br />Forward Landfill WMU FU -13 <br />Progress Meeting Minutes Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.