Laserfiche WebLink
Final Construction Quality Assurance Report—WMU FU-13 <br /> Forward Landfill <br /> 5.5 GEOCOMPOSITE.................................................................................................... 27 • <br /> 5.5.1 General and Receiving Inspection ............................................................ 27 <br /> 5.5.2 Receiving Inspection ................................................................................. 27 <br /> 5.5.3 Conformance Testing................................................................................ 28 <br /> 5.5.4 Deployment............................................................................................... 28 <br /> 5.5.5 Repair........................................................................................................ 28 <br /> 5.6 GEOGRID ............................................................................................................... 29 <br /> 5.6.1 General and Receiving Inspection ............................................................ 29 <br /> 5.6.2 Receiving Inspection ................................................................................. 29 <br /> 5.6.3 Conformance Testing................................................................................ 29 <br /> 5.6.4 Deployment............................................................................................... 29 <br /> 5.6.5 Repair........................................................................................................ 30 <br /> 6.0 POLYETHYLENE PIPE,TANKS, AND FITTINGS..............................................................31 <br /> 6.1 RECEIVING INSPECTION ........................................................................................ 31 <br /> 6.2 INSTALLATION....................................................................................................... 31 <br /> 7.0 AS-BUILT SURVEYS....................................................................................................32 <br /> 8.0 CONCLUSION............................................................................................................33 <br /> • <br /> APPENDICES <br /> Appendix A Design Modifications <br /> A.1 Revision to Geomembrane Specification <br /> A.2 Revision to Specified Normal Stress <br /> A.3 Revisions to the WMU FU-13 Construction Documents <br /> A.4 Revision to Section M of the Construction Drawings <br /> A.5 Revision to the Tank and LCRS Perforations <br /> A.6 Revision to Coarse Gravel Specification <br /> A.7 Revision to Allowable Ground Pressure <br /> A.8 Use of Geocomposite for Cushion <br /> Appendix B Construction Reports <br /> B.1 Daily Construction Reports <br /> 6.2 Weekly Construction Reports <br /> 13.3 Preconstruction Meeting Notes <br /> B.4 Weekly Progress Meeting Notes <br /> • <br /> ii Geo-Logic <br /> A 5 5 0 C I A T E 5 <br />