My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LEWIS ENGINEERING <br />-ice. •. • .• • .• r. <br />To: Lochlin Caffey/ Republic Services <br />CC: Scott Purdy/ GLA <br />Monte Christie/GLA <br />Erin Fanning/ Forward, Inc. <br />Ginter Struyzna/ Guinn Construction <br />Scott Harker/ Comanco <br />Chris Washa/ Comanco <br />Buck Buxton/ RJA <br />From: Sangeeta Lewis/ Lewis Engineering <br />Date: 5/30/2013 <br />Re: May 2013 Revisions to WMU FU -13 Construction Documents; Forward Landfill <br />Following are revisions to the WMU FU -13 construction documents: <br />• Section 02779 GEOGRID — The specification section has been modified to <br />clarify longitudinal seam overlap, geogrid panel orientation, and tensile testing <br />requirements. The revised specification section is attached. <br />• CQA Manual — The section regarding geogrid testing has been revised to <br />reflect the change in Tensile Testing. The revised CQA Manual is attached. <br />• Sheet 3 of 9, Construction Drawings — Due to settlement of the tie-in points <br />along the boundary of WMU FU -08 North, the grades in the upper plateau <br />area have been modified to provide a grade break at Elev. 68 -ft with a uniform <br />grade from the grade break to the tie-in. A revised set of Drawings, including <br />the revisions to Sht 3, is attached. <br />• Bid List - Due to the revisions to the upper plateau area, the quantities on the <br />bid list have been adjusted and are attached. <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.