Laserfiche WebLink
LEWIS ENGINEERING <br />-ice. •. • .• • .• r. <br />To: Lochlin Caffey/ Republic Services <br />CC: Scott Purdy/ GLA <br />Monte Christie/GLA <br />Erin Fanning/ Forward, Inc. <br />Ginter Struyzna/ Guinn Construction <br />Scott Harker/ Comanco <br />Chris Washa/ Comanco <br />Buck Buxton/ RJA <br />From: Sangeeta Lewis/ Lewis Engineering <br />Date: 5/30/2013 <br />Re: May 2013 Revisions to WMU FU -13 Construction Documents; Forward Landfill <br />Following are revisions to the WMU FU -13 construction documents: <br />• Section 02779 GEOGRID — The specification section has been modified to <br />clarify longitudinal seam overlap, geogrid panel orientation, and tensile testing <br />requirements. The revised specification section is attached. <br />• CQA Manual — The section regarding geogrid testing has been revised to <br />reflect the change in Tensile Testing. The revised CQA Manual is attached. <br />• Sheet 3 of 9, Construction Drawings — Due to settlement of the tie-in points <br />along the boundary of WMU FU -08 North, the grades in the upper plateau <br />area have been modified to provide a grade break at Elev. 68 -ft with a uniform <br />grade from the grade break to the tie-in. A revised set of Drawings, including <br />the revisions to Sht 3, is attached. <br />• Bid List - Due to the revisions to the upper plateau area, the quantities on the <br />bid list have been adjusted and are attached. <br />Page 1 <br />