My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e. C; - Soil Interaction Coefficient value shall be determined from long-term <br />effective stress pullout tests per GRI-GG5, unless the junction creep <br />testing of the geogrid is used to determine Ta. The C; value is determined <br />as follows: <br />C; = F <br />2 L GN tan <br />Where: F = Pullout force (lb/ft), per GRI-GG5 <br />L = Geogrid Embedment Length in Test (ft) <br />6N = Effective Normal Stress (psf) <br />� = Effective Soil Friction Angle, Degrees <br />PART 3 EXECUTION <br />3.1 EXAMINATION <br />A. The GEOSYNTHETIC CONTRACTOR and QA/QC CONSULTANT shall check <br />the geogrid upon delivery to verify that the proper material has been received. The <br />geogrid shall be inspected by the QA/QC CONSULTANT to be free of flaws or <br />damage occurring during manufacturing, shipping, or handling. <br />3.2 PREPARATION is <br />A. The subgrade soil shall be prepared as indicated on the Construction Drawings or as <br />directed by the DESIGN ENGINEER. Foundation soil shall be excavated to the lines <br />and grades as shown on the drawings or as directed by the DESIGN ENGINEER. <br />Overexcavated areas shall be filled with compacted backfill material. <br />3.3 INSTALLATION <br />A. Geogrid shall be laid at the proper elevation and oriented such that the panels extend <br />from the anchor trench at the crest of slope to the anchor trench at the tie-in to WNW <br />FU -08 North. Correct orientation (roll direction) of the geogrid shall be verified by <br />the QA/QC CONSULTANT. Geogrid may be temporarily secured in place with <br />staples, pins, sand bags, or backfill as required by fill properties, fill placement <br />procedures, or weather conditions, or as directed by the DESIGN ENGINEER. <br />B. Geogrid panels shall be placed directly next to the adjacent panel along the <br />longitudinal length. No overlap is required. <br />B. Geogrids shall be connected with a mechanical polymer bar along their latitudinal (i.e. <br />butt) seams. <br />Forward Landfill WMU FU -13 0 <br />02779 6 GEOGRID <br />
The URL can be used to link to this page
Your browser does not support the video tag.