My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Coordinate with the Earthwork Contractor and Owner to perform verification surveys at <br />the completion of clay liner operations. Verify corrective action measures as determined <br />by verification surveys. Verification surveys will also be used to determine the limits of <br />clay liner, clay plug, and clay earthfill for measurement and payment applications. <br />Submit copy of verification surveys to the Construction Manager. <br />3.4.5 Subgrade Preparation <br />• Verify that grade control construction staking is performed prior to work. <br />• Verify that angular or sharp rocks, and other debris that could damage the geomembrane <br />are removed from the surface of the subgrade. Verify that the subgrade is free of <br />irregularities and is steel drum rolled smooth prior to geosynthetic placement. <br />• Verify that the final surface provides continuous and intimate contact with the overlying <br />geosynthetic. <br />• Coordinate with the Earthwork Contractor and Owner to perform subgrade verification <br />surveys upon completion of the subgrade preparation. Verify corrective action measures <br />as determined by the verification surveys. Verification surveys will also be used to <br />determine the limits of the subgrade preparation for measurement and payment <br />applications. Submit copy of verification surveys to the Construction Manager. <br />3.4.6 Granular Drainage Material <br />• Review the Contractor's approved work plan of proposed methods to place granular <br />drainage material over geosynthetic installations. Determine and note corrective action <br />items if applicable. <br />• Perform soil tests to verify that the granular drainage material is in compliance with <br />material gradation and permeability requirements of the Specifications. Perform tests at <br />testing frequencies specified in Section 3.2.2. <br />• Monitor placement operations to verify that low ground pressure equipment is used in <br />accordance with the Specifications and that underlying geosynthetics installations are not <br />damaged during placement operations. Mark damaged geosynthetics and verify that <br />damage is repaired. <br />• Verify and record material thickness during placement operations. <br />• Coordinate with the Earthwork Contractor and Owner to perform verification surveys of <br />the granular drainage layer material upon completion of placement operations. Verify <br />0 <br />Page 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.