My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Verify that the Geosynthetics Contractor has the number of welding apparatuses and <br />spare parts necessary to perform the work. <br />• Verify that equipment used for welding will not damage the geomembrane. <br />• Verify that extrusion welders are purged before beginning a weld so that all heat - <br />degraded extrudate is removed from the nozzle of the welder. <br />• Verify that seam grinding is completed less than 1 hour before seam welding, and the <br />upper sheet is beveled (extrusion welding only). <br />• Verify that ambient temperature measured 6 -inches above the geomembrane surface is <br />between 400 and 1040 Fahrenheit. <br />• Verify that ends of extrusion welds that are more than 5 minutes old, are ground to <br />expose new material before restarting a weld. <br />• Verify that contact surfaces of the panels are clean, and free of dust, grease, dirt, debris <br />and moisture before welding. <br />• Verify that welds are free of dust, rocks and other debris. <br />• Verify that cross seams are ground to a smooth incline before welding (fusion welding <br />only). <br />• Verify that all seams are overlapped a minimum of 3 inches or in accordance with <br />manufacturer's recommendations, whichever is more stringent. <br />• Verify that solvents or adhesives are not present in the seam area. <br />• Verify that procedures used to temporarily hold the panels together do not damage the <br />panels and do not preclude CQA testing. <br />• Verify that strips of geomembrane, wide enough and long enough to protect the hot <br />wedge welder from running on the subgrade is placed below the geomembrane. These <br />strips may be as long as the seam itself or shorter and moved with the seaming <br />equipment. If necessary, a firm material such as a flat board or similar hard surface may <br />be placed directly under the weld overlap to achieve firm support. <br />• Verify that panels are being welded in accordance with the Construction Drawings and <br />Specifications. <br />0 Page 31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.