My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />Specifications. <br />• Verify that the geotextile was not exposed to direct sunlight for more than 5 days. <br />• Examine the geotextile after installation to ensure that no potentially harmful foreign <br />objects are present. <br />The QA/QC Inspector must inform both the QA/QC Manager and Earthwork Contractor if the above <br />conditions are not met. <br />4.3.4 Repairs <br />Repair procedures include: <br />• Patching --used to repair large holes, tears, and small defective areas. <br />• Removal --used to replace large defective areas where the preceding method is not <br />appropriate. <br />4.4 Geocomposite Drainage Net <br />4.4.1 Delivery <br />During delivery of geocomposite material the QA/QC Inspector will: <br />• Verify that equipment used to unload the rolls will not damage the geocomposite. <br />• Verify that care is used to unload the rolls. <br />• Verify that all documentation required by the Specifications has been received. <br />• Verify that each roll is marked or tagged with the following information: manufacturer's <br />name; project identification; lot number; roll number; roll dimensions. Log this <br />information on the geosynthetic receipt form. <br />• Verify that the geosynthetic receipt form is completed. <br />• Verify that materials are stored in a location that will protect the rolls from ultraviolet <br />light exposure, precipitation, mud, dirt, dust, puncture, cutting, or any other damaging or <br />deleterious conditions. <br />• Any damaged rolls maybe rejected. Verify that rejected material is removed from the site <br />or are stored at a location separate from accepted rolls. Geocomposite rolls that do not <br />0 <br />Page 39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.