My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_4
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_4
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_4.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br /> 1.0 INTRODUCTION............................................................................................................1 <br /> 2.0 Existing creek conditions.................................................................................................1 <br /> 2.1 Habitat Conditions.........................................................................................................1 <br /> 2.2 Jurisdictional Areas........................................................................................................4 <br /> 2.3 Flood Control Conditions ..............................................................................................4 <br /> 3.0 DESIGN GOALS AND OBJECTIVES.........................................................................4 <br /> 3.1 Habitat Recreation .........................................................................................................4 <br /> 3.2 Flood Control.................................................................................................................4 <br /> 3.3 Stable Channel Design...................................................................................................5 <br /> 4.0 DESIGN CONSIDERATIONS AND METHODOLOGIES .......................................5 <br /> 4.1 Hydrologic Considerations............................................................................................5 <br /> 4.2 Hydraulic Considerations ..............................................................................................6 <br /> 4.3 Channel Slope and Depth ..............................................................................................6 <br /> 4.4 Vegetation Class Concepts and Management................................................................7 <br /> 5.0 CHANNEL RELOCATION AND RESTORATION PROJECT DESCRIPTION 10 <br /> 5.1 General Stream Corridor Geometry.............................................................................10 <br /> 5.2 Geomorphic Considerations ........................................................................................10 <br /> 5.3 Meander Plan Form......................................................................................................10 <br /> 5.4 Hydraulic Analyses......................................................................................................1 l <br /> 5.5 Riparian Habitat Creation............................................................................................13 <br /> 5.6 Planting Plan................................................................................................................14 <br /> 5.7 Irrigation Plan..............................................................................................................15 <br /> 6.0 MAINTENANCE CONSIDERATIONS......................................................................15 <br /> 6.1 Vegetation Management..............................................................................................16 <br /> 6.2 Selective Clearing........................................................................................................17 <br /> 6.3 Criteria for Selective Clearing.....................................................................................18 <br /> 6.4 Species Diversity and Structural Complexity..............................................................19 <br /> 6.5 Uneven Class Management......................................................................................19 <br /> 6.6 Successional Stage...................................................................................................20 <br /> 6.7 Controlling Willow Growth.........................................................................................20 <br /> 6.8 Best Management Practices for Controlling Sprouting...............................................21 <br /> 6.9 Pruning,thinning, Clearing, and Sprout Removal.......................................................21 <br /> 6.10 Vegetative Management for Aquatic Resources and Fisheries...............................22 <br /> 6.11 Natural Debris..........................................................................................................23 <br /> APPENDICES <br /> Appendix A-Wetland Delineation <br /> Appendix B - HEC-RAS Outputs <br /> Appendix C- Vegetation Management <br /> Questa Engineering Corporation i 270124CDR/November 16, 2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.