TABLE
<br /> FORWARD LANDFILL
<br /> ANNUAL POST-CLOSURE MAINTENANCE AND MONITORING
<br /> COST ESTIMATE SUMMARY(2013)
<br /> Item Unit Price Total
<br /> No. Description Quantity
<br /> 1 LANDFILL GAS CONTROL(1)
<br /> System Maintenance/Repair
<br /> Inspection 64 hrs 65 per/hr $4,160
<br /> Labor 200 hrs 65 per/hr $13,000
<br /> Equipment 1 LS 10,250 $10,250
<br /> Materials 1 LS 44,800 $44,800
<br /> System Monitoring/Testing
<br /> Flare-Source Testing 1 LS 22,000 $22,000
<br /> Labor 160 hrs 65 per/hr $10,400
<br /> Equipment 1 LS 7,000 $7,000
<br /> Materials/Laboratory 1 LS 20,000 $20,000
<br /> Management 60 hrs 125 per/hr $7,500
<br /> Reporting 1 LS 15,000 $15,000
<br /> Subtotal $154,110
<br /> 2 GROUNDWATER MONITORING SYSTEM(2)
<br /> System Maintenance/Repair
<br /> Inspection 32 hrs 65 per/hr $2,080
<br /> Labor 60 hrs 65 per/hr $3,900
<br /> Equipment 1 LS 2,500 $2,500
<br /> Materials 1 LS 5,100 $5,100
<br /> System Monitoring
<br /> Labor 160 hrs 65 per/hr $10,400
<br /> ® Equipment 1 LS 6,700 $6,700
<br /> Materials/Laboratory 1 LS 95,000 $95,000
<br /> Management 32 hrs 125 per/hr $4,000
<br /> Analysis 80 hrs 100 per/hr $8,000
<br /> Reporting 1 LS 25,000 $25,000
<br /> Subtotal $162,680
<br /> 3 GROUNDWATER TREATMENT SYSTEM (3)
<br /> System Operation and Maintenance
<br /> Operation 1 LS 7200 $7,200
<br /> Labor 24 hrs 65 per/hr $1,560
<br /> Materials 1 LS 10,000 $10,000
<br /> Subtotal $18,760
<br /> 4 LEACHATE MANAGEMENT SYSTEM(4)
<br /> System Maintenance/Repair
<br /> Inspection 8 hrs 65 per/hr $520
<br /> Labor 16 hrs 65 per/hr $1,040
<br /> Equipment 1 LS 1,200 $1,200
<br /> Materials 1 LS 2,500 $2,500
<br /> System Monitoring
<br /> Labor 8 hrs 65 per/hr $520
<br /> Equipment 1 LS 500 $500
<br /> Materials/Laboratory 1 LS 7,500 $1,000
<br /> Management 4 hrs 125 per/hr $500
<br /> Analysis 8 hrs 100 per/hr $800
<br /> Reporting 1 LS 5,000 $5,000
<br /> Subtotal $13,580
<br /> Z:\PROJECTS\Allied Waste\Forward\Five Year Permit Rvw 2013\JTD-5 Yr PR 2013\Appendices\App A-PCPCMP 2013\Tables\Table 4-Post Closure Cost Estimate-
<br /> 2013;Amend.No.4:5/28/2013 Page 1 of 3
<br />
|