Laserfiche WebLink
TABLE <br /> FORWARD LANDFILL <br /> ANNUAL POST-CLOSURE MAINTENANCE AND MONITORING <br /> COST ESTIMATE SUMMARY(2013) <br /> Item Unit Price Total <br /> No. Description Quantity <br /> 1 LANDFILL GAS CONTROL(1) <br /> System Maintenance/Repair <br /> Inspection 64 hrs 65 per/hr $4,160 <br /> Labor 200 hrs 65 per/hr $13,000 <br /> Equipment 1 LS 10,250 $10,250 <br /> Materials 1 LS 44,800 $44,800 <br /> System Monitoring/Testing <br /> Flare-Source Testing 1 LS 22,000 $22,000 <br /> Labor 160 hrs 65 per/hr $10,400 <br /> Equipment 1 LS 7,000 $7,000 <br /> Materials/Laboratory 1 LS 20,000 $20,000 <br /> Management 60 hrs 125 per/hr $7,500 <br /> Reporting 1 LS 15,000 $15,000 <br /> Subtotal $154,110 <br /> 2 GROUNDWATER MONITORING SYSTEM(2) <br /> System Maintenance/Repair <br /> Inspection 32 hrs 65 per/hr $2,080 <br /> Labor 60 hrs 65 per/hr $3,900 <br /> Equipment 1 LS 2,500 $2,500 <br /> Materials 1 LS 5,100 $5,100 <br /> System Monitoring <br /> Labor 160 hrs 65 per/hr $10,400 <br /> ® Equipment 1 LS 6,700 $6,700 <br /> Materials/Laboratory 1 LS 95,000 $95,000 <br /> Management 32 hrs 125 per/hr $4,000 <br /> Analysis 80 hrs 100 per/hr $8,000 <br /> Reporting 1 LS 25,000 $25,000 <br /> Subtotal $162,680 <br /> 3 GROUNDWATER TREATMENT SYSTEM (3) <br /> System Operation and Maintenance <br /> Operation 1 LS 7200 $7,200 <br /> Labor 24 hrs 65 per/hr $1,560 <br /> Materials 1 LS 10,000 $10,000 <br /> Subtotal $18,760 <br /> 4 LEACHATE MANAGEMENT SYSTEM(4) <br /> System Maintenance/Repair <br /> Inspection 8 hrs 65 per/hr $520 <br /> Labor 16 hrs 65 per/hr $1,040 <br /> Equipment 1 LS 1,200 $1,200 <br /> Materials 1 LS 2,500 $2,500 <br /> System Monitoring <br /> Labor 8 hrs 65 per/hr $520 <br /> Equipment 1 LS 500 $500 <br /> Materials/Laboratory 1 LS 7,500 $1,000 <br /> Management 4 hrs 125 per/hr $500 <br /> Analysis 8 hrs 100 per/hr $800 <br /> Reporting 1 LS 5,000 $5,000 <br /> Subtotal $13,580 <br /> Z:\PROJECTS\Allied Waste\Forward\Five Year Permit Rvw 2013\JTD-5 Yr PR 2013\Appendices\App A-PCPCMP 2013\Tables\Table 4-Post Closure Cost Estimate- <br /> 2013;Amend.No.4:5/28/2013 Page 1 of 3 <br />