My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_4
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_4
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_4.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> 3.11 SITE SECURITY <br /> The Forward Landfill is currently equipped with a perimeter fence, gates, locks <br /> and signs. The fencing and locked gates restrict access by persons and vehicles <br /> other than those authorized. <br /> 3.12 STRUCTURE REMOVAL/DECO ISSION ING OF ENVIRONMENTAL <br /> CONTROL SYSTEMS <br /> At this time, there are no plans to decommission any structures or environmental <br /> control systems at the Forward Landfill during the closure of Stage IA. If deemed <br /> necessary, any decommissioning of boreholes, monitoring wells or peizometers <br /> will be conducted in accordance with the appropriate regulatory agency <br /> requirements (including notifications, as required) and in general accordance <br /> with post-closure maintenance plan procedures. <br /> 3.13 CLOSURE IMPLEMENTATION SCHEDULE <br /> 3.13.1 CLOSURE PROCESS <br /> As discussed in Section 1.5, Stage IA of the Forward Landfill will be closed in <br /> Summer 2005. Stage IA closure construction will begin with mobilization of <br /> equipment and materials. The type of equipment and required personnel <br /> expected to be utilized during closure construction includes but is not limited to, <br /> the following: <br /> • Equipment <br /> Scrapers <br /> Dozers <br /> Loaders <br /> Compactors <br /> Trucks <br /> Soil Screening Equipment <br /> Motor Grader <br /> Water Truck <br /> • Personnel <br /> Construction Manager <br /> Field Inspector(s) <br /> Engineer(s) <br /> Geotechnical Engineer/Geologist <br /> Forward Landfill PFCPCMP 3-16 <br /> J.-\Adlied\Forward\2005.0051 Partial Closure\Partial Closure Plan\ft-secIdoc:6/15/2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.